FY2027 Request
$322.9M
◆ Scaling +40%
HitchAI read

U.S. Air Force funding ramps 40% to a $322.9M request in FY2027 — the program's peak, before stepping down 51% across the five-year plan. In the FY2027 defense authorization, the House funded it in full; the Senate added 15% (to $370.9M); House appropriators added 0.4% (to $324.1M). Boeing leads the industry work.

FY2027 Request
$322.9M
▲ 40% vs FY2026
FY2026 Enacted
$229.9M
▲ 66% vs FY2025
FY2025 Actual
$138.3M
Prior year

For fiscal year 2027, the U.S. Air Force is requesting $322.9M for F-15E Squadrons under RDT&E program element 0207134F, up 40% over FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

1002003000138.3FY25ACTUAL229.9FY26ENACTED322.9FY27REQUEST149.3FY28170.1FY29171.1FY30157.1FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual138.3
FY2026Enacted229.9
FY2027Request322.9
FY2028Outyear149.3
FY2029Outyear170.1
FY2030Outyear171.1
FY2031Outyear157.1
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 7 — Operational System Development.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

1 project rolls up into PE 0207134F

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 40% overall, which can hide much larger swings below.

Project 676020

F-15 Modernization

$322.9MFY2027 request ▲ 40%
FY2025 actual$138.3M
FY2026 enacted$229.9M
FY2027 request$322.9M
Product DevelopmentSupportTest and EvaluationManagement Services

F-15 Modernization development efforts continue advancing the F-15E and F-15EX weapon system IAW the National Defense Strategy (NDS), ensuring the fleet will meet urgent and future capability needs, as well as compliment 5th and 6th-generation platforms by bringing substantial longe range fire, sensor, electronic warfare (EW) and beyond line of sight capabilities underpinning the Longe Range Kill Chain. The programs below provide the F-15E/EX fleet with electronic protection (EP) and electronic attack (EA) improvements, defensive and offensive capabilities for advanced standoff, threat and vulnerability mitigation, continued nuclear mission certification, integration of new and upgraded weapons, and improvements in long range and beyond line of sight (BLOS) communications. Operational Flight Program (OFP) funding provides ongoing software and hardware upgrades needed to meet and defeat emergent threats; integrate and fully exploit new and evolving weapons, offensive and defensive avionics and sensor capabilities, support continued nuclear certification and to continually innovate and improve integration of aircraft subsystems. Funds also provide for resolution of emergent safety of flight issues, training system updates, and compliance with Federal, Department of Defense, or Air Force mandates that are necessary to ensure continued aircrew safety and mission effectiveness. Funds may also help resolve diminishing manufacturing sources issues and improvements within F-15 Mission Planning. The OFP program uses a Continuous Development and Integration (CD&I) framework to deliver annual software OFP releases developed via agile development principals. This approach has demonstrated the ability to combat the speed of adversary technology evolution ensuring the F-15 maintains a competitive advantage. At any one time there are up to three OFP upgrades in work: one in requirements definition, one in code development, and one in flight test and release preparation. Flight Test funding supports ongoing F-15 Modernization by providing baseline infrastructure and personnel support for developmental test (DT) and operational test (OT) operations. In FY 2026, the Flight Test budget request includes funds for upgrading test jets to meet DT & OT requirements.

Accomplishments / planned programs (R-2A) — prior, current and budget year only
FY2025 actual$112.2M
FY2026 enacted$136.0M
FY2027 request$225.0M

Funding continues OFP development efforts improving war-fighting capabilities for the F-15E and the added capabilities of the F-15EX fleet. Addresses emergent needs for Long Range Kill Chain and Collaborative Combat Aircraft missions. Integrates new or improved capabilities enhancing the F-15's ability to engage in highly contested…

Read the FY2027 plan →
FY2025 actual$18.9M
FY2026 enacted$39.7M
FY2027 request$38.0M

Continue development for test fleet upgrades to meet DT & OT requirements. FY 2027 Flight Test funding provides: contractor support cadre at Eglin and Nellis AFBs for DT/OT support, avionics integration, lab operations & maintenance, Combined Test Force operations & maintenance, and long-lead test-unique equipment (i.e., program specific…

Read the FY2027 plan →
F-15 Radar Enhancements (RE)▲ 8%
FY2025 actual$7.3M
FY2026 enacted$8.3M
FY2027 request$9.0M

FY2027 planned work Continue development of F-15 capability enhancements, weapons integration, and future capability development. Continues implementation of electronic protection (EP)/electronic attack (EA) into OFPs, in addition to Combat ID candidate, interoperability, and risk reduction activities for future OFP integration. Continues study efforts to ensure the F-15 radar maintains superiority over current threats.

FY2026 to FY2027 change Funding increased due to development and enhancement of warfighting capabilities and evolution of critical program protection elements to maintain a competitive advantage against emergent and near-peer threats.

FY2026 plans — current year Continue development of F-15 capability enhancements, weapons integration, and future capability development. Continues implementation of electronic protection (EP)/electronic attack (EA) into OFPs, in addition to Combat ID candidate, interoperability, and risk reduction activities for future OFP integration. Continues study efforts to ensure the F-15 radar maintains superiority over current threats.

FY2025 actual$0.0M
FY2026 enacted$23.8M
FY2027 request$37.3M

Continue and expand software integration efforts with R-EGI prototypes in the system integration lab; maintain F-15 development baseline with R-EGI updates; expand testing and F-15-specific non-recurring engineering activities.

Read the FY2027 plan →
FY2025 actual$0.0M
FY2026 enacted$22.2M
FY2027 request$13.6M

Continue to develop and integrate single-band SATCOM apertures and terminals with aircraft systems and modify aircraft software (operational flight profile) to enable integration and sharing of data in accordance with DAF Battle Network architecture in an open architecture implementation. Conduct test & evaluation activities (systems…

Read the FY2027 plan →
Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$322.9M
House NDAA (HASC)HASC
$322.9M full · +$0
Senate NDAA (SASC)SASC
$370.9M +$48.0M · +15%
House Approps (HAC-D)HAC_D
$324.1M +$1.2M · +0.4%
▲ $48.0M chamber gap — unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

Boeing
$278.2M · 86%
OFP Suite 8/9/CD&I Development and Test · Various
Where FY2027 funding flowsShare$M
Industry primes86%278.2
Other / unspecified14%44.7
FY2027 request100%322.9
See Boeing's full federal contract ledger members
Program detail

Mission & acquisition strategy

F-15 Modernization development efforts continue advancing the F-15E and F-15EX weapon system IAW the National Defense Strategy (NDS), ensuring the fleet will meet urgent and future capability needs, as well as compliment 5th and 6th-generation platforms by bringing substantial longe range fire, sensor, electronic warfare (EW) and beyond line of sight capabilities underpinning the Longe Range Kill Chain.

Program is a continuation of effort which includes development for all F-15 models. Funds are executed in support of equipment improvement, study, analysis, and test. Acquisition and management strategies for each program are independently developed and use a variety of contract methods and types to accomplish program objectives.

Project 676020 — F-15 Modernization
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?How is the FY2027 request split between industry and government performers?In plain terms, what is this program element for and how is it being acquired?

This page carries the budget justification and the NDAA marks — nothing else. For what Boeing has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Air Force RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0207134F (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "F-15E Squadrons (PE 0207134F)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0207134F
Machine access
Markdown twin /programs/0207134F.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks