RDT&E Program Element · President's Budget PB2027

Aircraft Engine Component Improvement Program

PE 0207268F·U.S. Air Force·Approp. 3600 — RDT&E·BA7 — Operational System Development
FY2027 Request
$205.9M
◆ Scaling +221%
HitchAI read

U.S. Air Force funding ramps 221% to a $205.9M request in FY2027, sustained across the five-year plan. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators funded it in full. Pratt & Whitney leads the industry work.

FY2027 Request
$205.9M
▲ 221% vs FY2026
FY2026 Enacted
$64.1M
▲ 9.7% vs FY2025
FY2025 Actual
$58.4M
Prior year

Roll-up of 2 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Air Force is requesting $205.9M for Aircraft Engine Component Improvement Program under RDT&E program element 0207268F, up 221% over FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

50100150200058.4FY25ACTUAL64.1FY26ENACTED205.9FY27REQUEST208.6FY28209.6FY29210.8FY30212.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual58.4
FY2026Enacted64.1
FY2027Request205.9
FY2028Outyear208.6
FY2029Outyear209.6
FY2030Outyear210.8
FY2031Outyear212.0
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 7 — Operational System Development.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

2 projects roll up into PE 0207268F

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 221% overall, which can hide much larger swings below.

Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$205.9M
House NDAA (HASC)HASC
$205.9M full · +$0
Senate NDAA (SASC)SASC
$205.9M full · +$0
House Approps (HAC-D)HAC_D
$205.9M full · +$0
unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

Pratt & Whitney
$127.1M · 62%
Aircraft Engine CIP: Develop aircraft engine improvements-F100/F119/TF33 · CPFF
GE
$45.1M · 22%
Aircraft Engine CIP:Develop aircraft engine improvements - F110/F101/F118 · CPFF
Where FY2027 funding flowsShare$M
Industry primes86%177.4
Other / unspecified14%28.6
FY2027 request100%205.9
See Pratt & Whitney's full federal contract ledger members
Program detail

Mission & acquisition strategy

The Aircraft Engine Component Improvement Program (CIP) provides the only source of critical sustaining engineering support for in-service Air Force engines to maintain flight safety (highest priority), correct deficiencies, improve system Operational Readiness (OR), Reliability & Maintainability (R&M), reduce engine Life Cycle Cost (LCC), and sustain engines throughout their service lives. It also serves as the primary vehicle to implement emerging technology solutions (e.g., additive manufacturing and digital engineering) to resolve these issues, and improve engine performance.

Sole Source Indefinite Delivery/Indefinite Quantity (IDIQ) contracts to Original Equipment Manufacturers (OEMs) and DoD agencies with a 8-year ordering period and 10-year delivery period. Supports multiple tasks to accomplish CIP for more than 23 engine models.

Project 671012, 675365 — Aircraft Engine Component Improvement Program
  • Product Development
  • Test and Evaluation
  • Management Services
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?Which project inside PE 0207268F is growing fastest, and which is shrinking?How is the FY2027 request split between industry and government performers?

This page carries the budget justification and the NDAA marks — nothing else. For what Pratt & Whitney has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Air Force RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0207268F (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Aircraft Engine Component Improvement Program (PE 0207268F)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0207268F
Machine access
Markdown twin /programs/0207268F.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$172.4M
▲ 169% vs FY2026
FY2026 Enacted
$64.1M
▲ 9.7% vs FY2025
FY2025 Actual
$58.4M
Prior year

Aircraft Engine Component Improvement Program — one RDT&E project inside PE 0207268F. Congressional marks are recorded on the program element, not on a project.

Project 671012 — Aircraft Engine Component Improvement Program — requests $172.4M in FY2027, 84% of the $205.9M requested for program element 0207268F. Year over year it grows 169% against FY2026.

Funding trajectory

Project 671012 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

50100150058.4FY25ACTUAL64.1FY26ENACTED172.4FY27REQUEST174.3FY28174.7FY29175.2FY30175.7FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual58.4
FY2026Enacted64.1
FY2027Request172.4
FY2028Outyear174.3
FY2029Outyear174.7
FY2030Outyear175.2
FY2031Outyear175.7
Inside the project

4 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$8.2M
FY2026 enacted$10.0M
FY2027 request$25.1M

- Will execute multiple tasks to address engine issues and readiness associated with the F-15 and F-16 aircraft - Address engine component redesign, repair/rework procedures, engine maturation and life limit/mission analysis - Validate redesigned parts and new repair procedures - Maintain engine flight safety, address obsolescence…

Read the FY2027 plan →
FY2025 actual$11.6M
FY2026 enacted$8.4M
FY2027 request$21.1M

- Will execute multiple tasks to address engine issues and readiness associated with the B1, B-2, F-15, F-16, and U-2 aircraft - Address safety of flight, engine component redesign, repair/rework procedures, engine maturation and life limit/mission analysis - Validate redesigned parts and new repair procedures - Maintain engine flight…

Read the FY2027 plan →
FY2025 actual$19.7M
FY2026 enacted$22.5M
FY2027 request$56.6M

- Will execute multiple tasks to address engine issues and readiness associated with the F-22 aircraft - Address engine component redesign, repair/rework procedures, engine maturation and life limit/mission analysis - Validate redesigned parts and new repair procedures -AMT planning - Maintain engine flight safety, address obsolescence…

Read the FY2027 plan →
FY2025 actual$19.0M
FY2026 enacted$23.3M
FY2027 request$69.7M

- Address engine component redesign, repair/rework procedures, engine maturation and life limit/mission analysis - Validate redesigned parts and new repair procedures - Maintain engine flight safety, address obsolescence deficiencies, improve OR and R&M, reduce engine LCC, and sustain engines throughout their service life

Read the FY2027 plan →
Project 671012 — every activity in full →
Who's building it

Named performers on project 671012

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

Pratt & Whitney
$95.4M · 55%
GE
$45.1M · 26%
AEDC
$3.1M · 1.8%
Rolls Royce
$1.4M · 0.8%
Project detail

What project 671012 buys

The Aircraft Engine Component Improvement Program (CIP) provides the only source of critical sustaining engineering support for in-service Air Force engines to maintain flight safety (highest priority), correct deficiencies, improve system Operational Readiness (OR), Reliability & Maintainability (R&M), reduce engine Life Cycle Cost (LCC), and sustain engines throughout their service lives. It also serves as the primary vehicle to implement emerging technology solutions (e.g., additive manufacturing and digital engineering) to resolve these issues and improve engine performance. Past investments have reduced warfighter Class A rates and decreased Engine Related Loss of Aircraft (ERLOA) and generated significant returns on investments. Priority requirements include Accelerated Mission Tests (AMTs) required for complex redesigns. The AMT provides early identification of safety/reliability issues prior to the operational fleets discovering unknown safety and/or reliability issues. Ongoing tasks for this year support eliminating critical safety concerns, addressing obsolescence and Diminishing Manufacturing Sources and Material Shortage (DMSMS), developing critical repairs, and extending life limited parts. Service-related engine deficiencies occur throughout the engine lifecycle. Given the uncertainty regarding the number and timing of engine-related deficiencies, it is essential for the USAF to have adequate engineering capability and test capacity to rapidly respond to problems as they occur. Engine CIP funding is driven by field events and engine type/maturity, not by the total quantity of fielded engines. Program RDT&E funding may be utilized to implement innovation insertion, capability insertion, software increments, spiral upgrades, modular component swaps, and other insertions consistent with Modular Open System Architecture. Program RDT&E funding may be utilized to design, develop, integrate, and test weapon system and/or component level open architectures. Program RDT&E funding may be utilized to fund the concept refinement, design, development, integration, and testing of interdependent technologies and common architectures that underpin weapon system and portfolio-wide mission outcomes.

R-3 lines of work
  • Product Development
  • Test and Evaluation
  • Management Services
FY2027 Request
$33.6M
No FY2026 funding
FY2026 Enacted
$0.0M
No FY2025 funding
FY2025 Actual
$0.0M
Prior year

F135 Aircraft Engine Component Improvement Program — one RDT&E project inside PE 0207268F. Congressional marks are recorded on the program element, not on a project.

Project 675365 — F135 Aircraft Engine Component Improvement Program — requests $33.6M in FY2027, 16% of the $205.9M requested for program element 0207268F. It is a new start — no prior-year or current-year money.

Funding trajectory

Project 675365 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

2500.0FY25ACTUAL0.0FY26ENACTED33.6FY27REQUEST34.3FY2834.9FY2935.6FY3036.3FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.0
FY2026Enacted0.0
FY2027Request33.6
FY2028Outyear34.3
FY2029Outyear34.9
FY2030Outyear35.6
FY2031Outyear36.3
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$0.0M
FY2026 enacted$0.0M
FY2027 request$33.6M

-Execute approximately 80+ AF-funded F135 engine tasks supporting F-35 flying operations. -Conduct accelerated mission test and analytical condition inspection -Address safety of flight, engine component redesign, repair/rework procedures and life limit/mission analysis. -Validate redesigned parts and new repair procedures…

Read the FY2027 plan →
Project 675365 — every activity in full →
Who's building it

Named performers on project 675365

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

Pratt & Whitney
$31.7M · 94%
AEDC
$0.5M · 1.5%
Project detail

What project 675365 buys

The F135 Aircraft Engine Component Improvement Program (CIP) supports the F-35 single-engine fighter propulsion system and provides critical sustaining engineering support for the F135 engine. F135 CIP maintains flight safety (highest priority), corrects service revealed deficiencies, improves system Operational Readiness (OR) and Reliability & Maintainability (R&M), reduces propulsion system Life Cycle Cost (LCC), and sustains the propulsion system throughout its service life. Past investments have reduced warfighter Class A rates and decreased Engine Related Loss of Aircraft (ERLOA) and generated significant returns on investments. F135 CIP, through "Lead the Fleet" operational use and accelerated mission testing, identifies and fixes propulsion-related problems ahead of operational impacts. F135 CIP ensures continued improvements in R&M, which reduce out year support costs. Program RDT&E funding may be utilized to implement innovation insertion, capability insertion, software increments, spiral upgrades, modular component swaps, and other insertions consistent with Modular Open System Architecture. Program RDT&E funding may be utilized to design, develop, integrate, and test weapon system and/or component level open architectures. Program RDT&E funding may be utilized to fund the concept refinement, design, development, integration, and testing of interdependent technologies and common architectures that underpin weapon system and portfolio-wide mission outcomes.

R-3 lines of work
  • Product Development
  • Test and Evaluation
  • Management Services