RDT&E Program Element · President's Budget PB2027

Ballistic Missile Defense Midcourse Defense Segment Test

PE 0604887C·Defense-Wide·Approp. 0400 — RDT&E·BA4 — Advanced Component Development & Prototypes
FY2027 Request
$53.8M
◆ Scaling +40%
HitchAI read

Defense-Wide funding ramps 40% to a $53.8M request in FY2027, sustained across the five-year plan. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators funded it in full. Boeing leads the industry work.

FY2027 Request
$53.8M
▲ 40% vs FY2026
FY2026 Enacted
$38.3M
▼ 3.7% vs FY2025
FY2025 Actual
$39.8M
Prior year

Roll-up of 2 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, Defense-Wide agencies are requesting $53.8M for Ballistic Missile Defense Midcourse Defense Segment Test under RDT&E program element 0604887C, up 40% over FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

50100150200039.8FY25ACTUAL38.3FY26ENACTED53.8FY27REQUEST90.3FY2890.2FY29217.1FY3056.5FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual39.8
FY2026Enacted38.3
FY2027Request53.8
FY2028Outyear90.3
FY2029Outyear90.2
FY2030Outyear217.1
FY2031Outyear56.5
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 4 — Advanced Component Development & Prototypes.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Current
Prototyping
BA 4
Later
Development & Fielding
BA 5–7
Inside the program element

2 projects roll up into PE 0604887C

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 40% overall, which can hide much larger swings below.

Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$53.8M
House NDAA (HASC)HASC
$53.8M full · +$0
Senate NDAA (SASC)SASC
$53.8M full · +$0
House Approps (HAC-D)HAC_D
$53.8M full · +$0
unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

Boeing
$20.6M · 38%
Resources - Prime Infrastructure Support, Labs, and Communications - SITR · CPAF
RTX / Raytheon
$8.6M · 16%
Ground Test Execution - Ground Test Execution - LRDR · CPAF
Where FY2027 funding flowsShare$M
Industry primes70%37.4
Government labs & warfare centers27%14.3
Other / unspecified3.8%2.0
FY2027 request100%53.8
See Boeing's full federal contract ledger members
Program detail

Mission & acquisition strategy

Missile Defense Midcourse Defense Segment Test provides flight, ground, and cyber testing of hardware and software to demonstrate an integrated capability to counter the allocated threats. The hardware and software are tested in an integrated environment with Missile Defense System Sensors; Command and Control, Battle Management, and Communications; United States Northern Command (USNORTHCOM) Warfighters; and national collection assets to assess and demonstrate the ability to defend the United States Homeland. Primary activities include planning, design, and execution of flight tests, ground tests, cyber tests; test resources; and program operations.

The GMD program will continue to execute testing, development, and evolutionary acquisition through incremental development. The GMD acquisition strategy ensures GMD products are upgraded to improve GMD Weapon System performance to meet Warfighter requirements and defeat the allocated threats. This acquisition approach reduces obsolescence risk, provides incremental capability improvements, and allows decision makers to make informed trades between cost, schedule, and performance while rapidly delivering improved operational and technological capabilities.

Project MT08, MD40 — Midcourse Test
  • Support
  • Test and Evaluation
  • Management Services
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?Which project inside PE 0604887C is growing fastest, and which is shrinking?How is the FY2027 request split between industry and government performers?

This page carries the budget justification and the NDAA marks — nothing else. For what Boeing has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Office of the Secretary of Defense RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0604887C (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Ballistic Missile Defense Midcourse Defense Segment Test (PE 0604887C)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0604887C
Machine access
Markdown twin /programs/0604887C.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$51.9M
▲ 41% vs FY2026
FY2026 Enacted
$36.7M
▼ 3.9% vs FY2025
FY2025 Actual
$38.2M
Prior year

Midcourse Test — one RDT&E project inside PE 0604887C. Congressional marks are recorded on the program element, not on a project.

Project MT08 — Midcourse Test — requests $51.9M in FY2027, 96% of the $53.8M requested for program element 0604887C. Year over year it grows 41% against FY2026.

Funding trajectory

Project MT08 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

50100150200038.2FY25ACTUAL36.7FY26ENACTED51.9FY27REQUEST87.5FY2887.0FY29208.6FY3054.2FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual38.2
FY2026Enacted36.7
FY2027Request51.9
FY2028Outyear87.5
FY2029Outyear87.0
FY2030Outyear208.6
FY2031Outyear54.2
Inside the project

3 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Resources▼ 27%
FY2025 actual$16.5M
FY2026 enacted$19.7M
FY2027 request$14.4M

- Continue laboratory test infrastructure planning to integrate and test the upgraded Ground-Based Midcourse Defense Program hardware and software in support of flight, ground, and cyber testing. - Continue testing infrastructure and coordination for flight test range support from VSFB for future flight testing. - Continue testing…

Read the FY2027 plan →
Ground Test Execution▲ 273%
FY2025 actual$11.4M
FY2026 enacted$7.1M
FY2027 request$26.4M

Increase from Fiscal Year (FY) 2026 to FY 2027 is in accordance with the Integrated Master Test Plan requirements. The Missile Defense System Test Program realigned the Missile Defense Agency's (MDA) Flight Test Budget from Program Element (PE) Ballistic Missile Defense Test 0603914C to PE Ballistic Missile Defense Midcourse Defense…

Program Operations▲ 11%
FY2025 actual$10.3M
FY2026 enacted$10.0M
FY2027 request$11.1M

Increase from Fiscal Year (FY) 2026 to FY 2027 is in accordance with the Integrated Master Test Plan requirements. The Missile Defense System Test Program realigned the Missile Defense Agency's (MDA) Flight Test Budget from Program Element (PE) Ballistic Missile Defense Test 0603914C to PE Ballistic Missile Defense Midcourse Defense…

Project MT08 — every activity in full →
Who's building it

Named performers on project MT08

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

Boeing
$20.6M · 40%
RTX / Raytheon
$8.6M · 16%
MP SOLUTIONS
$4.9M · 9.4%
Northrop Grumman
$3.4M · 6.6%
Project detail

What project MT08 buys

Missile Defense Midcourse Defense Segment Test provides flight, ground, and cyber testing of hardware and software to demonstrate an integrated capability to counter the allocated threats. The hardware and software are tested in an integrated environment with Missile Defense System Sensors; Command and Control, Battle Management, and Communications; United States Northern Command (USNORTHCOM) Warfighters; and national collection assets to assess and demonstrate the ability to defend the United States Homeland. Primary activities include planning, design, and execution of flight tests, ground tests, cyber tests; test resources; and program operations. Flight tests provide the opportunity to test actual hardware and software and to demonstrate Missile Defense System interoperability under operationally realistic conditions. Ground-Based Midcourse Defense Program participates in integrated Missile Defense System ground tests executed in both the Hardware-in-the-Loop (HWIL) lab environment and with deployed operational assets providing integrated performance data supporting hardware and software fielding decisions. The Ground-Based Midcourse Defense Program conducts cyber tests and participates in integrated Missile Defense System level cyber tests executed both in the HWIL lab environment and using operational assets providing performance data supporting cyber, operational resilience, and system survivability assessments. Test resources provide the infrastructure and laboratories to support the Ground Missile Defense (GMD) test program as well as day-to-day operations of the GMD test program to include support for test planning, execution, and post-event reconstruction. Program operations provide for technical and business management support of the test program.

R-3 lines of work
  • Support
  • Test and Evaluation
  • Management Services
FY2027 Request
$1.9M
▲ 20% vs FY2026
FY2026 Enacted
$1.6M
▲ 2.6% vs FY2025
FY2025 Actual
$1.5M
Prior year

Program Wide Support — one RDT&E project inside PE 0604887C. Congressional marks are recorded on the program element, not on a project.

Project MD40 — Program Wide Support — requests $1.9M in FY2027, 3.5% of the $53.8M requested for program element 0604887C. Year over year it grows 20% against FY2026.

Funding trajectory

Project MD40 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

01.5FY25ACTUAL1.6FY26ENACTED1.9FY27REQUEST2.8FY283.2FY298.5FY302.3FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual1.5
FY2026Enacted1.6
FY2027Request1.9
FY2028Outyear2.8
FY2029Outyear3.2
FY2030Outyear8.5
FY2031Outyear2.3
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

Program Wide Support▲ 20%
FY2025 actual$1.5M
FY2026 enacted$1.6M
FY2027 request$1.9M

FY2026 to FY2027 change - Increase from FY 2026 to FY 2027 provides the PWS allocation on a pro-rata basis across multiple Agency PE's each FY based on the total Agency budget and, therefore, fluctuates per PE by FY.

Project detail

What project MD40 buys

PWS contains non-headquarters management costs in support of Missile Defense Agency (MDA) functions and activities across the entire Missile Defense System. These functions include Government Civilians and Contract Support Services. This effort provides integrity and oversight of the Missile Defense System as well as supports MDA in the development and evaluation of technologies that will respond to the changing threat. Additionally, PWS includes personnel to support global deployments performing deployment site preparation and activation, and provides facility capabilities for MDA Executing Agent locations worldwide. Other MDA wide costs include: physical and technical security; civilian drug testing; audit readiness; the Science, Technology, Engineering, and Mathematics (STEM) program; legal services and settlements; travel and agency training; office, equipment, vehicle, and warehouse leases; utilities and base operations across multiple geographic locations; commercial and ancillary facility services; management of all facility aspects regardless of lifecycle stage; supplies and maintenance; compliance with statutory environmental requirements; data and unified communications support; materiel and readiness and central property management of equipment; Facilities Sustainment, Restoration and Modernization (FSRM) program (formerly Real Property Maintenance) to keep the Department's inventory of facilities in good working order; and similar operating expenses. PWS is allocated on a pro-rata basis across most Agency PEs and, therefore, fluctuates per PE by FY based on the total Agency budget in that FY.

R-3 lines of work
  • Support