Roll-up of 6 projects. Projects are the summable leaves — the PE total is their sum, never added to it.
For fiscal year 2027, the U.S. Navy is requesting $115.8M for Consolidated Trng Sys Dev under RDT&E program element 0204571N, down 42% from FY2026.
Funding profile, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 156.8 |
| FY2026 | Enacted | 199.1 |
| FY2027 | Request | 115.8 |
| FY2028 | Outyear | 148.5 |
| FY2029 | Outyear | 136.1 |
| FY2030 | Outyear | 113.8 |
| FY2031 | Outyear | 115.8 |
Acquisition lifecycle
This program is funded in RDT&E Budget Activity 7 — Operational System Development.
6 projects roll up into PE 0204571N
Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -42% overall, which can hide much larger swings below.
Surface Tactical Team Trainer (STTT)
Air Warfare Training
Adversary Mission Systems
Training Range & Instr Dev
High Fidelity Surface Trainers
Congressional marks
Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.
Where the FY2027 request goes
Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.
| Where FY2027 funding flows | Share | $M |
|---|---|---|
| Industry primes | 55% | 63.7 |
| Government labs & warfare centers | 35% | 40.5 |
| Other / unspecified | 10.0% | 11.6 |
| FY2027 request | 100% | 115.8 |
Mission & acquisition strategy
Project 0604 Training Range and Instrumentation Development (TRID) projects develop specialized instrumentations for fleet readiness training while minimizing life cycle costs. Projects are development efforts to upgrade systems that have been fielded or have received approval for full rate production and anticipate production funding in the current or subsequent fiscal year. Project 1427, Surface Tactical Team Trainer (STTT) develops upgrades during the sustainment phase of the Battle Force Tactical Training (BFTT) system and its modernization into the Advanced Training Domain (ATD), forging ready warfighters for the Fleet.
Adversary Mission Systems (AMS) established as a program of record in 2024 and has since been pursuing an official acquisition program designation. Originally, due to the relatively small size of the AMS program and desire to rapidly develop and field AMS products to Fleet users, AMS began working toward designation under the Middle Tier Acquisition (MTA) pathway. Due to DoW policy changes in early 2025 directing the use of the Adaptive Acquisition Framework (AAF), the AMS program has been designated under the Software Acquisition Pathway (SWP). The Airborne Adversary Mission Systems (AMS) acquisition strategy for system development utilizes the SWP incorporation of Continuous Improvement/Continuous Deliveries.
- Product Development
- Support
- Test and Evaluation
- Management Services
Ask this program element
Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.
This page carries the budget justification and the NDAA marks — nothing else. For what NAWCAD has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.
Cite this page
/programs/0204571N.md · MCP mcp.hitchintel.com → budget_get_program_element, budget_get_cong_marksTACTS/LATR Replacement — one RDT&E project inside PE 0204571N. Congressional marks are recorded on the program element, not on a project.
Project 3093 — TACTS/LATR Replacement — requests $48.5M in FY2027, 42% of the $115.8M requested for program element 0204571N. Year over year it falls 46% against FY2026.
Project 3093 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 64.0 |
| FY2026 | Enacted | 90.3 |
| FY2027 | Request | 48.5 |
| FY2028 | Outyear | 62.6 |
| FY2029 | Outyear | 57.8 |
| FY2030 | Outyear | 49.8 |
| FY2031 | Outyear | 50.6 |
5 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
Funds are allocated to the ALLAI program to continue the integration and developmental testing of Live, Virtual, and Constructive (LVC) software capabilities on the F/A-18, including updated Next Generation Threat System (NGTS) simulations and waveform optimization. Resources will support required Cross Domain Solution (CDS) design…
Read the FY2027 plan →TCTS II will continue to develop, test and deliver software to include NGTS and Open Air Battle Shaping (OABS) incorporation with a path to complete threat replication, and NCTE compatibility. With the number of TCTS II systems being fielded, waveform modifications will occur for spectral efficiency and increasing event size and…
Read the FY2027 plan →E-2D Internal Mount will continue development and integration of a chassis mounted solution to provide encrypted Time, Space, Position Information (TSPI) in support of Tactical Training Range operations. Development will include pursuing National Security Agency (NSA) certification to an upgrade to the current TCTS II encryptor to be in…
Develop and integrate government-owned standards and architecture for aviation performance data collection, supported by tactical subject matter experts (SMEs) and data scientists. The system includes multilevel security databases, network capabilities, and intelligent, semi-automated assessments, reporting, and visualization tools, all…
Read the FY2027 plan →This is a continuation of development and integration of Link Inject to Live (LITL). LITL will integrate Live, Virtual, Constructive (LVC) exercises for training purposes. LITL utilizes a synthetic scenario generation tool and integrates live game players into the synthetic environment by a message set communicated over Link-16…
Named performers on project 3093
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 3093 buys
The Tactical Combat Training System Increment II (TCTS II) will provide an improved environment for air combat training utilizing a secure air-to-air and air-to-ground data link, and will provide range tethered and range less operation capability to CONUS ranges and Forward Deployed Naval Forces (FDNF). TCTS Increment II will provide encrypted instrumentation for multiple fixed and rotary wing platforms as well as an enhanced threat environment. In 2023, TCTS II started development of Synthetic Inject to Live (SITL) capability, which enables blue and red constructive (e.g. aircraft, air and surface threats) injects into aircraft displays and sensors to train aircrews for near-peer threats. The program is integrating into the Navy Continuous Training Environment (NCTE), allowing mission data from "Live" participants to be monitored at a control facility and disseminated across the LVC ecosystem. TCTS Increment II provides the foundational encrypted airborne network for implementation of Aviation Live Virtual Constructive (LVC) capabilities. TCTS II will continue software updates to address fleet requirements. Aviation LVC Live Aircraft Integration (ALLAI) Phase 1 funds the integration of live aircraft into the LVC, blended training environment to close the Great Powers Competition training capability gap for mission rehearsal. Aviation LVC will establish an integrated System of Systems (SoS) training environment bringing already-developed capabilities together with new developmental efforts to form a cohesive architecture that accurately emulates the high end fight for warfighter training. LVC takes a hybrid approach to aviation and Fleet-wide training where the training audience in the form of Live personnel operating Live equipment (to include aircraft and surface vessels) will be teamed with Live aircrew operating simulators to provide a Virtual complement in the "Blue Air" picture. The "Red" adversary for this training is made up of Live personnel operating Live aircraft complemented by computer generated "Red" Constructive Air and Surface threats that stimulate the "Blue" Air displays and sensors as if a "Red" Live adversary were present.
- Product Development
- Support
- Test and Evaluation
- Management Services
Surface Tactical Team Trainer (STTT) — one RDT&E project inside PE 0204571N. Congressional marks are recorded on the program element, not on a project.
Project 1427 — Surface Tactical Team Trainer (STTT) — requests $40.2M in FY2027, 35% of the $115.8M requested for program element 0204571N. Year over year it falls 48% against FY2026.
Project 1427 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 71.1 |
| FY2026 | Enacted | 77.5 |
| FY2027 | Request | 40.2 |
| FY2028 | Outyear | 51.6 |
| FY2029 | Outyear | 44.8 |
| FY2030 | Outyear | 30.6 |
| FY2031 | Outyear | 31.2 |
3 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
Continue development, integration and testing ATD with AEGIS and SSDS to continue alignment with evolving combat system builds. Continue development and integration of ATD to incorporate training capabilities to support AEGIS and SSDS tactical capability updates. Continue development and delivering threat database updates to enable ships…
Continue development of updates to integrated combat system data collection and After-Action review/Debrief also known as Data Collection and Debrief (DCD) products also known as Data Collection and Debrief (DCD) for Aegis Baseline 9 and follow that are aligned to tactical improvements that will provide an effective means for instructors…
Read the FY2027 plan →Continue to conduct systems engineering and development activities to integrate Surface Training Program (STP) (formerly Surface Training Advanced Virtual Environment (STAVE)) high fidelity simulations and the Advanced Training Domain (ATD) Live, Virtual and Constructive (LVC) Training Capability within the Integrated Combat System (ICS)…
Read the FY2027 plan →Named performers on project 1427
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 1427 buys
The Department's submission reflects the results of a deep dive into Fleet Training Wholeness (FTW) and how to provide a means for Strike Group Training in a contested environment, in accordance with Chief of Naval Operations guidance. This analysis determined the most cost-effective means to provide this training is via a combination of Live, Virtual, Constructive (LVC) capabilities, which are essential for building a force that has overmatch. LVC capabilities leverage combat system product line architecture components and engineering best practices for iterative development. The deep dive identified that there is no other cost-effective way to train our ready warfighters for a contested environment. The foundation for LVC has already been established and will continue to execute the investment strategy to provide initial underway LVC capability to train Strike Group(s) in an environment that they expect to fight in, ensuring they are fit to fight and win. The development, integration and testing of LVC's, along with ensuring interoperability with surface and air communities, will be accomplished across Integrated Warfare Systems (IWS), and Navy Continuous Training Environment (NCTE). Surface Tactical Team Trainer (STTT) develops modifications during sustainment of Battle Force Tactical Training (BFTT) system and modernization into the Advanced Training Domain (ATD). Both BFTT and ATD are the core systems that are used to integrate weapon system elements, and combat system components to create the Total Ship Training Capability (TSTC). BFTT and ATD continue to integrate and update, as new tactical capabilities are being introduced, to enable crew operator proficiency training for basic and sustainment level training events, through distributed strike group certification fleet synthetic training (FST) events and including Composite Training Unit Exercise (COMPTUEX) FST underway LVC events. Continued development is required to integrate new capabilities and interfaces to provide training for AEGIS and Ships Self Defense System (SSDS) combat system capability upgrades, and to address the Fleet's LVC FTW initiative.
- Product Development
- Test and Evaluation
- Management Services
Air Warfare Training — one RDT&E project inside PE 0204571N. Congressional marks are recorded on the program element, not on a project.
Project 2124 — Air Warfare Training — requests $11.9M in FY2027, 10% of the $115.8M requested for program element 0204571N. Year over year it falls 1.8% against FY2026.
Project 2124 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 12.2 |
| FY2026 | Enacted | 12.1 |
| FY2027 | Request | 11.9 |
| FY2028 | Outyear | 12.3 |
| FY2029 | Outyear | 12.5 |
| FY2030 | Outyear | 12.6 |
| FY2031 | Outyear | 12.8 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
Funds are allocated to continue the development and integration of advanced training capabilities, including the enhancement of data collection and fusion for semi-automated performance measurement and debriefing in Live, Virtual, and Constructive (LVC) training environments, and the transition of Virtual/Augmented/Mixed Reality display…
Read the FY2027 plan →Named performers on project 2124
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 2124 buys
MISSION: This effort advances science and technology initiatives to modernize Naval Aviation training systems, enabling integration of emerging capabilities into operational training. Aligned with the PMA-205 5-Year LVC Flight Plan, the Navy Aviation Simulation Master Plan, and all Navy and Marine Corps T/M/S training requirements, this project supports Fleet readiness by developing, demonstrating, and transitioning key technologies that enhance training effectiveness, scalability, and interoperability. Current initiatives focus on advancing human performance analytics through tools that support the Aircrew Proficiency and Performance Assessment (APPA) program. These efforts enable automated skill assessment, individualized debrief, and data-driven training optimization across live and virtual environments. Model-Based Systems Engineering (MBSE) approaches are used to support rapid requirements analysis, architecture development, and capability integration. Additional work includes the maturation of immersive training solutions such as intelligent semi-automated forces, augmented and mixed reality environments, adaptive mission rehearsal tools, and high-fidelity simulations of sensors, weapons, and environmental effects. This project also supports the development of advanced analytics tools for the Joint Simulation Environment (JSE) and high-fidelity modeling for the Next Generation Threat System (NGTS), enabling greater realism and operational value for JSE and other training systems. Technologies under development are evaluated and refined using testbeds that incorporate aviator feedback to ensure operational suitability and alignment with Fleet needs. Collectively, this effort accelerates the transition of innovative training capabilities to the Fleet and ensures Naval Aviation remains prepared to meet evolving mission demands across all warfare domains.
- Product Development
- Support
- Test and Evaluation
- Management Services
Adversary Mission Systems — one RDT&E project inside PE 0204571N. Congressional marks are recorded on the program element, not on a project.
Project 1982 — Adversary Mission Systems — requests $10.4M in FY2027, 9.0% of the $115.8M requested for program element 0204571N. Year over year it falls 32% against FY2026.
Project 1982 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 5.2 |
| FY2026 | Enacted | 15.3 |
| FY2027 | Request | 10.4 |
| FY2028 | Outyear | 17.2 |
| FY2029 | Outyear | 16.4 |
| FY2030 | Outyear | 16.1 |
| FY2031 | Outyear | 16.4 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
Continue hardware and software research and development activities for peer threat representative models, hardware development activities for Infrared Search and Track (IRST), as well as integration of existing onboard combat systems into the RedNet architecture. Development and integration testing of continuous software solutions and…
Read the FY2027 plan →Named performers on project 1982
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 1982 buys
Airborne Adversary Mission Systems builds upon existing RedNet architecture to enable classified software development and classified hardware integration such as electronic attack, infrared search, Radio Frequency (RF) emulation with encrypted range training data links, such as Tactical Combat Training System (TCTS) and Link 16. This project will enable the aircrew to accurately emulate peer threat capabilities and provide a standalone Adversary Operational Flight Program (OFP)', that can be deployed on any aircraft with RedNet Multi-Layered Obstructed Brokered Bus-Controller & Routing for Advanced Integrated Networks (MOBBrain) avionics architecture and an encrypted range training pod. Primary platforms for development include the F-5, F-16 and F-18 within existing Naval Adversary Squadrons. These systems combined with a classified electronic kneeboard, allows for the development, integration and deployment of adversary mission hardware and software systems without modification of aircraft's existing OFP software. This program will provide for the future ability to participate fully in the Live Virtual Constructive (LVC) environment as well as provide physics and effects-based threat replications for the mission essential training of deploying Fleet aircrews.
- Product Development
- Support
- Test and Evaluation
- Management Services
Training Range & Instr Dev — one RDT&E project inside PE 0204571N. Congressional marks are recorded on the program element, not on a project.
Project 0604 — Training Range & Instr Dev — requests $4.0M in FY2027, 3.5% of the $115.8M requested for program element 0204571N. Year over year it grows 31% against FY2026.
Project 0604 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 4.2 |
| FY2026 | Enacted | 3.1 |
| FY2027 | Request | 4.0 |
| FY2028 | Outyear | 4.0 |
| FY2029 | Outyear | 3.8 |
| FY2030 | Outyear | 3.9 |
| FY2031 | Outyear | 3.9 |
3 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2027 planned work Funds are allocated for the continued development of RE&M specialized instrumentation and to execute required upgrades for fielded Warfighter Instrumentation Support System (WISS) and Live Training System (LTS) hardware.
FY2026 to FY2027 change The increase of 0.138 from FY 2026 to FY 2027 will allow for investment in software updates that improve warfighter lethality and improve warfighter ordnance delivery.
FY2026 plans — current year Continue to develop RE&M specialized instrumentation and upgrade fielded systems of WISS and LTS.
FY2027 planned work Research and Development of Tactical Combat Training System Increment I (TCTS I) applications with Navy Continuous Training Environment (NCTE) Interoperability Standard (NIS) Test and Training Enabling Network Architecture (TENA) and Live Virtual Constructive (LVC) TENA compliance. Research and Development of Complete Red Hat Enterprise Linux (RHEL) 9 integration with Large Area Tracking Range (LATR).
FY2026 to FY2027 change The increase of 0.930 from FY 2026 to FY 2027 will fund software and system upgrades that provide interoperability between USN and USAF platforms in a strategic, joint environment.
FY2026 plans — current year Develop ACMI specialized instrumentation for fleet readiness training.
FY2027 planned work Develop Ocean Systems Portable Range Augmentation, Standardization of data products and investigation of range acoustic signal processors (ASP)
FY2026 to FY2027 change The decrease of 0.111 from FY 2026 to FY 2027 will decrease underwater training range acoustic signal processor reliability due to less maintenance on legacy system.
FY2026 plans — current year Develop Ocean Systems specialized instrumentation for fleet readiness training.
Named performers on project 0604
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 0604 buys
Training Range and Instrumentation Development (TRID) projects develop specialized instrumentations for fleet readiness training while minimizing life cycle costs. Projects are development efforts to upgrade systems that have been fielded or have received approval for full rate production and anticipate production funding in the current or subsequent fiscal year.
- Product Development
- Support
- Test and Evaluation
- Management Services
High Fidelity Surface Trainers — one RDT&E project inside PE 0204571N. Congressional marks are recorded on the program element, not on a project.
Project 3356 — High Fidelity Surface Trainers — requests $0.8M in FY2027, 0.7% of the $115.8M requested for program element 0204571N. Year over year it falls 8.7% against FY2026.
Project 3356 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 0.0 |
| FY2026 | Enacted | 0.9 |
| FY2027 | Request | 0.8 |
| FY2028 | Outyear | 0.8 |
| FY2029 | Outyear | 0.8 |
| FY2030 | Outyear | 0.9 |
| FY2031 | Outyear | 0.9 |
2 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2027 planned work Research and development of the Integrated Combat System (ICS) in the in the Surface Combat Systems Training Environment (SCSTE). Funds are in support of risk reduction for the Integrated Combat System (ICS) in to future builds of CIAT.
FY2026 to FY2027 change FY27 decrease reflects the completion of the Combat System Simulator/Stimulator (CS3) in a Surface Combat Systems Training Environment (SCSTE) environment.
FY2026 plans — current year Continuation of research and development of the Combat System Simulator/Stimulator (CS3) in the Surface Combat Systems Training Environment (SCSTE). Funds are in support to incorporate future AEGIS baseline builds into CIAT
FY2027 planned work FY27 funding supports government labor and the continuation of oversight to complete analysis and work on Combat Systems training courseware determining alternative media solutions that are Surface Training Program (STP) compliant and provide an improved, blended training solution. The same level of analysis effort conducted for Combat Systems courseware will be initiated for the Engineering STP courseware.
FY2026 to FY2027 change FY27 decrease is due to reduced design, development, engineering, implementation, and testing of the combat system modifications for Lethality and Survivability (L&S).
FY2026 plans — current year Requirements previously captured within PE 0603581N / Project 4506 (LCS Training) for FY26 were realigned to PE 0205471N / Project 3356 (High Fidelity Surface Trainers). FY26 funding supports government labor and oversight to complete analysis and work on Combat Systems training courseware determining alternative media solutions that are Surface Training Program (STP) compliant and provide an improved, blended training solution. The same level of analysis effort conducted for Combat Systems courseware will be initiated for the Engineering STP courseware.
Named performers on project 3356
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 3356 buys
This line funds high fidelity Aegis Integrated Air and Missile Defense (IAMD) individual, instructor, strike group and team trainers to support all Advanced Capability Build (ACB) and below Aegis baselines. This line provides funds for development of a High Fidelity Aegis Combined Integrated Air and Missile Defense (IAMD) and Anti-Submarine Warfare (ASW) Trainer (CIAT) to enable tactics, techniques, and procedure development and allow advanced warfare training (AWT) Phase II and Surface Warfare Advanced Tactical training objectives to be accomplished ashore and to support Active and Passive Sonar Operations, Target Motion Analysis, Sonobuoy Localization, Command and Control, and execution of ASW Kill chain. Funds are provided for advanced component technology development, prototype evaluation, and technology readiness level assessment. Development of these trainers is in response to CNO Wholeness Review and Department of the Navy requirements. This line supports Surface Training Program (STP) methodology by researching and developing trainers that will create an immersive and interactive learning environment and support both CNO High Velocity Learning and Career Training Continuum (CTC) intent. It includes development of the Surface Training and Readiness Management System (STRMS) required for the identification of quantifiable operator and maintainer competencies for each mission area and associated tracking system development and testing. This line also funds training scenario development for Integrated Tactical Trainers and Bridge Part Task Trainers. Funds provide for alignment with DON Chief Information Officer (CIO) Cyber requirements.
- Product Development