Roll-up of 11 projects. Projects are the summable leaves — the PE total is their sum, never added to it.
For fiscal year 2027, the U.S. Army is requesting $121.5M for Information Technology Development under RDT&E program element 0605013A, down 2.2% from FY2026. In the FY2027 defense authorization, House moved to cut it to $116.5M.
Funding profile, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 92.1 |
| FY2026 | Enacted | 124.2 |
| FY2027 | Request | 121.5 |
| FY2028 | Outyear | 120.3 |
| FY2029 | Outyear | 119.5 |
| FY2030 | Outyear | 116.4 |
| FY2031 | Outyear | 114.9 |
Acquisition lifecycle
This program is funded in RDT&E Budget Activity 5 — System Development & Demonstration.
11 projects roll up into PE 0605013A
Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -2% overall, which can hide much larger swings below. The 8 largest have their own view above; the rest are shown in full here.
Information Technology for Training Systems
Operational Medicine Information System
Human Resouces Information Technology
Information Technology for Criminal Investigations
Army Accessioning IT Development
Army Human Resource System
Information Systems for Installations
ASMIS-R (REPORTIT)
The Army Safety Management Information System (ASMIS) 2.0 is the Army's designated system of record for Army Safety and Occupational Health (SOH) data collection, information management, decision support, and reporting. It is built to holistically support the information management needs of the Army SOH program in accordance with Public Law 91-596, Executive Order 12196, DoDI 6055.01, The Army Strategy LOE 1: Build Readiness, LOE 2: Modernize, AR 385-10, and Assistant Secretary of the Army - Installations, Energy and Environment strategic guidance. ASMIS 2.0 enables commanders and Army senior leaders to use data collected via these six key capabilities and other DoW data sources to prevent accidental losses, reduce associated costs and enhance readiness. ASMIS 2.0 currently interfaces with 9 DoW systems and will interface with 22 upon completion. It directly supports the Warfighter through improved IT-enabled business processes and enterprise data analytics to enhance decision-making at all levels of the Army through greater use of leading indicators. In support of the Army Data Strategy, ASMIS 2.0 enables the Army to make SOH data visible, accessible, understandable, linked, trustworthy, interoperable, and secure (VAULTIS). Beyond the cost avoidance and reduction achieved by loss prevention, ASMIS 2.0 provides additional cost savings by eliminating 11 legacy systems. In FY27, the development of the support functionality for each of the 14 functional areas of the Army Safety and Occupational Health Program (ASOHP) will be executed based on business processes defined and capabilities needed.
FY2027 planned work FY27 Plans: In FY 2027, capabilities to support the overarching policies, responsibilities, and procedures (program management) for a specific functional area (FA) of the Army Safety and Occupational Health Program (ASOHP), as directed via AR 385-10 and DoDI 6055.01. The ASOHP consists of 14 functional areas structured for mishap prevention in Army operations. It provides for public safety incidental to Army operations and activities. The ASOHP functional areas are necessary for sustaining operations of the U.S. Army whether at an installation, during contingency operations, or in wartime conditions (see table AR 385-10, Table 1-1). Each organization's strategic goals and objectives should…
FY2026 to FY2027 change Increase is based on revised economic assumptions.
FY2026 plans — current year In FY 2026, two capabilities are scheduled for implementation. Both of them are major deliverables and each brings benefit to the Army: 1. ASMIS 2.0 Safety & Occupational Health Training Module. This module will provide a comprehensive delivery and management mechanism for OSHA training requirements within the Army's industrial base. The ability to measure and track training down to the unit level and team level is a critical element of management of the Army's SOH program, as directed via the DoDi 6055-01 and AR 385-10. 2. ASMIS 2.0 Analytics and AI Integration/Augmentation. The current ASMIS analytics capability will be augmented to encompass broader data types and sets from across DoW…
FY2025 accomplishments In FY 2025, the Explosives Safety Management Module is being developed as a component within the SOH Program Management module. This capability will encompass all aspects of explosives safety to include explosives site plan management, storage, disposal, and all workflows necessary to support those activities across the Army. We are also completing the SOH Training and Education module as the fifth key module of the ASMIS 2.0 family of systems.
USMEPCOM TRANSFORMTION - IT MODERNIZATION
Installation Support Modules
This project supports the U.S. Army Coalition Interoperability Assurance and Validation (CIAV) Research Network. CIAV provides an enduring and agile capability to execute approved processes. The project provides a repeatable and persistent infrastructure within the assurance and validation Coalition partner environment designed to ensure the succinct exchange of critical mission data between Mission Partners throughout all phases of military operations. It also enables the Army's implementation of Mission Partner Environment (MPE) and Combined-Joint All Domain Command and Control. CIAV uses a mission-based interoperability approach to identify capabilities, limitations and associated operational impacts and provides recommendations to improve or resolve information exchange issues between the U.S. Army and its mission partners. Funding facilitates coalition interoperability information exchange issue in compliance with AR 34-1 Multinational Force Interoperability and DODI 8110.01, MPE Information Sharing Capability Implementation for the DOW. Project does not have funding in FY 2027 due to mission sunset.
FY2026 to FY2027 change Funding decreases due to mission sunset. Project will not be funded beyond FY 2026.
FY2026 plans — current year Conduct end-to-end analysis of mission-based interoperability effectiveness of the operational objective through validated operational and technical requirements. Conduct warfighter lab-based risk reduction events (RRE), Federated Mission Network spiral test cases, Multinational Interoperability Program testing, Battle Command systems change request testing, and Joint Command and Control Assessment. Provide Coalition Interoperability Assessment and Validation (CIAV) testing with 22 nations connected to the CIAV test network.
FY2025 accomplishments Conduct end-to-end analysis of mission-based interoperability effectiveness of the operational objective through validated operational and technical requirements. Federated Mission Networking (FMN) Mission Services are the end-to-end sets of activities and data required to successfully execute an element of an operational mission, such as battlespace management and joint fire support. Provide Coalition Interoperability Assessment and Validation (CIAV) theater on-site interoperability testing. Provide annual Common Mission Network Transport (CMNT) Transport Fee for coalition information sharing via the Coalition Verification and Validation Environment; provide Annual Central Technical…
The request is contested
Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.
Where the FY2027 request goes
Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.
| Where FY2027 funding flows | Share | $M |
|---|---|---|
| Industry primes | 28% | 34.6 |
| Government labs & warfare centers | 6.1% | 7.4 |
| Other / unspecified | 65% | 79.5 |
| FY2027 request | 100% | 121.5 |
Mission & acquisition strategy
Army Business System Modernization Initiatives include: 1. Enterprise Business Systems-Convergence (EBS-C): SAP announced that the current application, Enterprise Central Component (ECC), would not be maintained after 2027 and customers will be required to upgrade to their new version SAP S/4 HANA. In response to this notification, the Army conducted studies in 2019/2020 by the Business Enterprise IT Leaders Group chaired by the Office of Business Transformation.
EBS-C transitioned to the Execution Phase of the Software Acquisition Pathway in Q4 FY2024 under DoD Instruction 5000.87. The Execution Phase enables the initial delivery of minimum viable capability release (MVCR) within 12 months (achieved in July of FY 2025). This will be followed by further enhancements and the delivery of 42 capability sets on the EBS-C portfolio roadmap. To enable this, the Army awarded an Other Transaction Authority (OTA) to a Technical Integration Provider in late FY 2024 to support the development of the EBS-C solution.
- Management Services
- Product Development
- Test and Evaluation
Ask this program element
Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.
This page carries the budget justification and the NDAA marks — nothing else. For what JJR has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.
Cite this page
/programs/0605013A.md · MCP mcp.hitchintel.com → budget_get_program_element, budget_get_cong_marksArmy Business System Modernization Initiatives — one RDT&E project inside PE 0605013A. Congressional marks are recorded on the program element, not on a project.
Project T05 — Army Business System Modernization Initiatives — requests $87.2M in FY2027, 72% of the $121.5M requested for program element 0605013A. Year over year it grows 6.9% against FY2026.
Project T05 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 51.0 |
| FY2026 | Enacted | 81.5 |
| FY2027 | Request | 87.2 |
| FY2028 | Outyear | 90.2 |
| FY2029 | Outyear | 89.9 |
| FY2030 | Outyear | 85.3 |
| FY2031 | Outyear | 81.3 |
5 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
Acquisition and Program Management Activities = $13.024 million The Software Pathway Program has a comprehensive approach to managing its development efforts. Acquisition and Program Management oversees new development efforts, ensuring optimal performance and creating necessary documentation for milestones and checkpoints. This effort…
Read the FY2027 plan →FY 2027 funding will be used to award a follow-on contract to fund agile sprint teams in support of continuous development of analytical and reporting capabilities within Army Vantage and development of the transactional and data layer within the GFIM Objective Environment (OE), which will allow for subsumption of the following legacy…
Read the FY2027 plan →FY 2027 funding will be used to continue effort(s) to mitigate risk with enterprise data platform migration, pilot an open architecture universal data connection adapter to broker data with legacy systems, and further support the Army CIOs API layer enabling the enterprise data mesh construct. The features and advantages of the platform…
Continue development of ESMS to optimize assessments for pavement, utilities, rails, and other facility types.
FY 2027 funds will continue to modernize application software for the AEWRS from earlier software to improve its risk management posture, as well as providing additional mandated reporting capabilities required by revised statutes and federal/DoW policies.
Named performers on project T05
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project T05 buys
Army Business System Modernization Initiatives include: 1. Enterprise Business Systems-Convergence (EBS-C): SAP announced that the current application, Enterprise Central Component (ECC), would not be maintained after 2027 and customers will be required to upgrade to their new version SAP S/4 HANA. In response to this notification, the Army conducted studies in 2019/2020 by the Business Enterprise IT Leaders Group chaired by the Office of Business Transformation. Based on the results of these studies and direction from the Under Secretary of the Army, EBS-C is executing a strategic approach to modernize the Army business system landscape; align modern combat and combat support system capabilities with existing modernization efforts to enable Army force dominance during multi-domain large-scale combat operations in contested logistics environments; and improve overall Army financial operations resulting in improved financial management and successful audit outcomes. The Army is working EBS-C requirements to improve process agility and cross process integration; provide consistent user experiences with an intuitive user interface; and improve data integrity and security. At the enterprise level, EBS-C seeks to integrate financial and logistics processes and create opportunities to decrease overall Defense Business Systems (DBS) redundancies and duplications existing in the Army portfolio. The in-scope DBS for this effort includes General Funds Enterprise Business Systems (GFEBS) and GFEBS-Sensitive Activities (SA), Logistics Management Program (LMP), Global Combat Support System (GCSS)-Army, Army Enterprise System Integration Program (AESIP) Hub, and numerous non-ERP systems performing needed logistics and financial functions. FY 2027 dollars in the amount of $67.090 million will enable the development of the EBS-C solution and the establishment of the Continuous Integration and Continuous Delivery (Cl/CD) pipeline. The development will continue based on the Minimum Viable Capability Release in FY 2025 deployed to the EBS-C solution in FedRAMP compliant government provided cloud environments utilizing proven agile methodology. 2.
- Management Services
- Product Development
- Test and Evaluation
Information Technology for Training Systems — one RDT&E project inside PE 0605013A. Congressional marks are recorded on the program element, not on a project.
Project FM8 — Information Technology for Training Systems — requests $12.2M in FY2027, 10% of the $121.5M requested for program element 0605013A. Year over year it grows 0.9% against FY2026.
Project FM8 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 11.1 |
| FY2026 | Enacted | 12.1 |
| FY2027 | Request | 12.2 |
| FY2028 | Outyear | 12.2 |
| FY2029 | Outyear | 12.2 |
| FY2030 | Outyear | 13.9 |
| FY2031 | Outyear | 16.6 |
2 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
FY 2027 RDTE dollars in the amount of $11.047 million will enable ATIS to sunset SRP GIS TK, SRPP, TSIMS, Institutional Training. Features of the sunset systems will be delivered in continuous integrated releases of capability in accordance with Agile Project Management's Continuous Integration/Continuous Development (CI/CD) model…
Read the FY2027 plan →FY 2027 funding will refine AI assisted item development capabilities, initiate development of automated and empirical item, exam, and pool health analysis, and initiate development of examinee response simulation capabilities.
Named performers on project FM8
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project FM8 buys
This project funds information technology systems that support Army Training. The two systems under FM8 are described below. Of those, the Army Training Information System (ATIS) is an Army priority and the focus of the major investment in FM8. ATIS directly supports two of the four Army Unit Readiness Priorities - Training and Leader Development and serves as an enabler for Manning, Equipping, and Scheduling. 1. Army Training Information System (ATIS) Problem Statement: The Army's current collection of non-integrated training information systems provides limited utility with data that is unreliable, un-trusted, inaccessible, and not responsive to user needs. Sustaining these systems, with their various architectures, standards, and service providers results in higher operating and sustainment costs to the Army. Objective: Collapse 20 legacy systems into a single portal supporting 5 training capability areas. Solution: Utilizing Commercial Off the Shelf (COTS) software ATIS will deliver a single portal enterprise training environment capability encompassing scheduling, training development, learning content management, training management, and resource management for all individual, as well as collective training and education. As ATIS is fielded, the Army will reduce the overall cost of the training environment by retiring the duplicative, stove piped systems and improve performance with a data-centric, governed, and architecturally compliant system. ATIS will sunset 20 antiquated information training systems costing over $75M annually. - Training Development: provides ability to develop and coordinate information, including training packages, training events, courses, and exercises. - Training Management: provides centralized ability to access and manage information, including individual and collective/unit training that supports mission tasks and individual training records. - Enterprise Scheduling: provides a single integrated set of applications to schedule training resources, including transportation, classrooms, ranges, supplies, and mandated legal/social individual and unit training. - Content Management: provides centralized access to training information anytime, anywhere, including educational and professional instruction. - Resource Management: provides ability to manage availability/sustainability of training enablers and resources.
- Management Services
- Product Development
- Support
Operational Medicine Information System — one RDT&E project inside PE 0605013A. Congressional marks are recorded on the program element, not on a project.
Project DH1 — Operational Medicine Information System — requests $6.8M in FY2027, 5.6% of the $121.5M requested for program element 0605013A. Year over year it grows 32% against FY2026.
Project DH1 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 6.6 |
| FY2026 | Enacted | 5.2 |
| FY2027 | Request | 6.8 |
| FY2028 | Outyear | 2.3 |
| FY2029 | Outyear | 2.3 |
| FY2030 | Outyear | 2.3 |
| FY2031 | Outyear | 2.4 |
3 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2027 planned work The emphasis in FY 2027 will focus on providing Army-adopted Joint OHIT software applications and modernization of Army-specific OHIT software using Agile software development. Activities include achieving and maintaining cybersecurity authorizations (Authorities to Operate and Authorities to Connect) across all Combatant Commands, continued modernization of Army-specific capabilities as identified by the Army Medical Capability Managers, and development activities required to field Joint OHIT capabilities to the Army.
FY2026 to FY2027 change FY 2027 decrease is due to shift in programmatic focus as resources required for integration of Joint Products into the Army environment occurring in FY 2027.
FY2026 plans — current year The emphasis in FY 2026 will focus on ensuring the continuous testing and integration of Army-adopted Joint OHIT software applications and/or the Agile development and/or modernization of Army-specific OHIT software, maintaining OHIT software cybersecurity, and ensuring all OHIT software on Army networks, including the ITN.
FY2025 accomplishments The engineering integration effort will be accomplished by independent evaluation, verification, and validation of modernized JOMIS software operating on Army infrastructure. Effective operation and cyber security will be ensured and provide Authority to Operate/Authority to Connect on all networks where electronic health records may reside. Where necessary, any software artifacts (threads, reports, queries, scripts, data export schemas) will be developed for specific external system interfaces with other components of the Army systems. Configuration and quality assurance for the overall systems will be overseen and managed in this activity. The objective of this activity is to demonstrate…
FY2027 planned work All testing initiatives will fully adopt and incorporate Agile software methods and processes to develop, test, and execute to deliver capabilities quickly and effectively. The iterative testing process will include the functional community, support engineering and allow rapid response to changes in operations and technology. The test objectives will assess the design and implementation of each software delivery to ensure suitability, performance and suitability requirements to operate within the tactical Army environment on Army networks and Army hardware are adequately met. Comprehensive testing not only covers testing that is part of the Continuous Integration / Continuous Delivery but…
FY2026 to FY2027 change FY 2027 increase is due to the required testing environment for assessing performance of Joint, Army, and Commercial OHIT and to fund cyber risk mitigation activities to include Adversarial Analysis (AA) and Cyber Vulnerability Penetration Assessments (CVPA). Testing will also occur through participation in exercises such as Project Convergence Capstone 7 and those sponsored by Army Service Component Commands.
FY2026 plans — current year All testing initiatives will fully adopt and incorporate Agile software methods and processes to develop, test, and execute to deliver capabilities quickly and effectively. The iterative testing process will include the functional community, support engineering and allow rapid response to changes in operations and technology. The test objectives will assess the design and implementation of each software delivery to ensure requirements down to the lowest level are satisfied as well as to ensure that new capability did not disrupt capability implemented in a previous delivery. Developmental testing is a continuous process throughout the development cycle permitting early identification of…
FY2025 accomplishments All testing initiatives will fully adopt and incorporate Agile software methods and processes of developing, testing, and executing to deliver capabilities fast and effectively. The iterative testing process will support engineering and allow rapid response to changes in operations and technology. The testing strategy will address identification of test objectives, baselines and foundations to be tested, hardware and software configurations to be tested, development of Use Cases to fully exercise the application's functionality, step-by-step procedures at the key stroke level, Entrance/Exit criteria, Pass/Fail criteria, failure identification and analysis, and schedules. Regression testing…
FY2027 planned work OMIS-A focus areas address providing software and training deployment infrastructure and development of updated digital training products for Joint, Army, and Commercial Products within the OMIS-A portfolio. Training development for digital training products ensures all existing digital training modules are consistently updated as new mature software versions are released to Army medical providers as well as ensuring the JOMIS training material are properly modified to satisfy Army training requirements. OMIS-A needs to establish and maintain multiple cloud environments for dissemination of software products, digital training products, and to host cloud-based capabilities that span multiple…
FY2026 to FY2027 change FY 2027 increase is due to increased funding requirements to provide capabilities within Enterprise Cloud Management Activity's cloud infrastructure.
FY2026 plans — current year OMIS-A focus areas include ensuring all existing CBT modules are consistently updated as the software constantly matures, and new versions are released to Army medical providers as well as ensuring the JOMIS training material are properly modified to satisfy Army training requirements and are accessible to Army units. OMIS-A tracks learner progress, identifies areas where further support/modification may be needed, and utilizes user feedback to ensure the training is sufficient and efficient for Soldiers to properly learn the OHIT software and effectively use the software in operational settings.
FY2025 accomplishments In FY 2025, training information and materials provided by Joint program for modernized capabilities will be modified for use by Army medical personnel via computer-based training (CBT). The purpose and benefits of CBTs over traditional in-person Army training is flexible and convenient accessibility to the training, reduced time and cost for the OMIS-A program by eliminating the need for physical travel, scalability so there is no limit on the number of students enrolled in any given course, and improved interactive student engagement.
Named performers on project DH1
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project DH1 buys
The Operational Medicine Information Systems-Army (OMIS-A) Program Office provides modernized Operational Health Information Technology (OHIT) software applications supporting Army Operational Medicine units and deployed medical personnel around the world. It fulfills the requirements mandating the proper electronic documentation of deployed Service members' medical treatment enabling a comprehensive and accurate life-long medical record for every Soldier. The medical treatment captured will not only follow the Warfighter from point of injury (POI) through the continuum of care, but will also enable and inform the five operational healthcare functions: patient documentation, patient movement, medical logistics, medical command and control, and medical situational awareness (Med C2/SA). Requirements in the operational environment are constantly evolving and to ensure the Warfighter's needs are being met. The OMIS-A program provides the following capabilities: - Develops and/or Integrates OHIT software applications onto numerous Army networks, including the Army Integrated Tactical Network (ITN) - Evaluates software provided by the Joint Operational Medicine Information Systems (JOMIS) program to ensure effective operation and cyber compliance on Army network infrastructures - Develops OHIT software applications for Army specific requirements that JOMIS can/will not provide - Maintain Authority to Operate/Authority to Connect for all OHIT software applications on Army infrastructure - Field and train capabilities to all Army units OMIS-A utilizes Agile software development methods and processes that emphasize user involvement and rapid delivery in response to changes in the operational environmental, Warfighter requirements, technology, and budgets. OMIS-A's initial priority is the modernization of the Army's currently fielded OHIT software. Funding provides engineering, developmental testing, software development, and integration of both Joint and Army specific OHIT software capabilities and ensures the software properly works on Army hardware and various Army networks.
- Product Development
- Test and Evaluation
Human Resouces Information Technology — one RDT&E project inside PE 0605013A. Congressional marks are recorded on the program element, not on a project.
Project FM7 — Human Resouces Information Technology — requests $5.4M in FY2027, 4.4% of the $121.5M requested for program element 0605013A. Year over year it grows 18% against FY2026.
Project FM7 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 6.9 |
| FY2026 | Enacted | 4.5 |
| FY2027 | Request | 5.4 |
| FY2028 | Outyear | 5.7 |
| FY2029 | Outyear | 5.9 |
| FY2030 | Outyear | 6.2 |
| FY2031 | Outyear | 5.9 |
4 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2027 planned work FY 2027 funding will be used to complete the ASBS-S Phase III / ASBS 2.0 development. This will involve integrating legacy applications that support selection board preparation, post-board analysis and reporting, special board execution (including GO, Promotion, and Special Boards), and exemplary performance processing. meets compliance with Army Common Operating Environment standards in accordance with Army Application Management Business Office (AAMBO).
FY2026 to FY2027 change Funding increase due to revised economic assumptions.
FY2026 plans — current year FY 2026 funding continues to support iPERMS enhancements and modifications, as well as development of interfaces based upon emerging requirements, cybersecurity, functionality, and compliance with Army standards, cArmy Cloud Migration efforts, and ASBS 2.0 development which also supports DA G1 Talent Management Task Force Battalion Command Assessment Program (BCAP) which is estimated for completion by Sep 2027. Additionally, USAHRC will utilize FY 2026 funding to complete rationalize data and databases to achieve the Army Data Strategy, modernizing applications to leverage authoritative data sources to reduce duplicate application capabilities, resulting in data and applications requiring…
FY2025 accomplishments FY 2025 funding continues to support iPERMS enhancements and modifications, as well as development of interfaces based upon emerging requirements, cybersecurity, functionality, and compliance with Army standards, cArmy Cloud Migration efforts, and ASBS 2.0 development which also supports all and DA G1 Talent Management Task Force Battalion Command Assessment Program (BCAP) and is estimated for completion by Sep 2027. Additionally, USAHRC has utilized all FY 2024 and FY 2025 funding towards the completion of a viable ASBS 2.0 product while enhancing iPERMS auditing features to achieve the Army Data Strategy, modernizing applications to leverage authoritative data sources to reduce duplicate…
FY2027 planned work The Army Records Management and Declassification programs are in needed of this funding to modernize the Army-wide records through application software development that will enhance efficiency, accessibility, security, and scalability. More specifically, the goal is to obtain application software that can automate manual record-keeping processes, reducing human errors, and streamline workflows. Through modernization, we can access records through cloud-based solutions or mobile applications. This accessibility ensures that authorized personnel can retrieve, update, and analyze records from various locations, improving collaboration, and decision-making. Army records that contain sensitive…
FY2026 to FY2027 change FY 2027 funding increase is due to technology enhancements including cloud services, modernization, and lifecycle replacements. Specifically, this additional funding will close capability gaps, eliminate compliance risks, capability gaps, eliminating compliance risks, thus ensuring a reliable, secure records management infrastructure.
FY2026 plans — current year The Army Records Management and Declassification programs are in needed of this funding to modernize the Army-wide records through application software development that will enhance efficiency, accessibility, security, and scalability. More specifically, the goal is to obtain application software that can automate manual record-keeping processes, reducing human errors, and streamline workflows. Through modernization, we can access records through cloud-based solutions or mobile applications. This accessibility ensures that authorized personnel can retrieve, update, and analyze records from various locations, improving collaboration, and decision-making. Army records that contain sensitive…
FY2025 accomplishments Funds are used to sustain technology refresh efforts ensuring the Army's records comply with statutory and regulatory requirements, preserves individual record integrity, mitigates the risk of historical information loss, and ensures official Army records are available for Congressional, Government Accountability Office, Executive Branch, and FOIA requirements. We fund contractor man-years to sustain this system through an IT Services contract.
FY2027 planned work FY 2027 Funding will cover the contract option period for the extensive software development needed to bring the Family Advocacy Program (FAP) in compliance with various NDAA and DoDI 6400 series requirements. Specifically, the new modules developed; Fatality Review, Incident (Case) Management, FAP Client Intake Portal, Incident Data Entry, Local Database Reports, Database Extraction (Army Central Registry), Victim Advocacy, Commanders, Prevention, and Client Intake. This modernization contract will ensure the continued translation of the FASOR legacy code to allow the transition into the new database needed to sustain compliance with both DoW and Army FAP regulatory requirements while…
FY2026 to FY2027 change The funding reduction represents reduced level of effort required, during FY 2027, based on the completion of scheduled software development in FY2026 to bring the Family Advocacy Program in compliance with various NDAA and DODI 6400 Series requirements.
FY2026 plans — current year FY 2026 Funding will cover the new contract for Modernization that includes extensive software development of modules/functionality to bring the Family Advocacy Program (FAP) in compliance with various NDAA and DoDI 6400 series requirements. New modules include, but are not limited to, Fatality Review, Incident (Case) Management, FAP Client Intake Portal, Incident Data Entry, Local Database Reports, Database Extraction (Army Central Registry) , Victim Advocacy, Commanders, Prevention, and Client Intake. When the NDAA, DoDI 6400 manuals or other directives contain changes for implementation across the FAP, the functional representatives prioritize these needs within existing requirements…
FY2025 accomplishments FY 2025 funding provided continued software development & architecture support as additional functionality was implemented while finalizing the migration of the legacy FASOR data into a new modernized structure. High level functionality modules include, but was not limited to; Family Advocacy Program (FAP) Incident (Case) Management and FAP Data / Reporting.
FY2027 planned work FY 2027 funding will continue to expand efforts to address the full range of harmful behaviors to provide a comprehensive understanding of harmful behaviors and their impact on outcomes of interest to senior leaders. This program will support the Army's ability to leverage technology to track program outcomes, refine prevention efforts, and address recommendations from the OSW Sexual Assault and Suicide Independent Review Commissions (IRCs).
FY2026 to FY2027 change Funding increase due to revised economic assumptions.
FY2026 plans — current year FY 2026 funding will support the development of infrastructure aimed at integrating disparate data sources, tracking trends over time, and leveraging primary and secondary data to inform prevention recommendations. FY 2026 funding will continue to expand efforts to address the full range of harmful behaviors. This program will support the Army's ability to refine prevention efforts and address recommendations from the OSW Sexual Assault and Suicide Independent Review Commissions (IRCs).
FY2025 accomplishments Maintain ability of Army leaders at all levels to manage ICRS data through E-Document Format and documents upload capabilities within ICRS. Continue support of Advanced Analytics capabilities, business intelligence capabilities, and predictive analysis for SHARP Data to inform increased Prevention efforts in line with the OSD Sexual Assault Independent Review Commission (IRC) recommendations.
Named performers on project FM7
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project FM7 buys
The efforts under this project support the Army's Human Resources Information Technology needs. 1. Human Resource Command (HRC) Core IT: 1. The Human Resource Command (HRC) Core IT program develops and tests IT solutions to support the Army's Warfighter Support Mission and future needs. It focuses on enhancing logistics, personnel, transportation, training, medical/health protection, and sustaining base functions. The program aims to streamline applications, upgrade the Army Selection Board System (ASBS-S) to meet Army Common Operating Environment standards, and complete limited portions of ASBS-S Phase III / ASBS 2.0 development previously determined to be RDT&E in order to complete the subsumption of legacy applications supporting selection board preparation, post-board analysis and reporting, special board execution (including GO, Promotion, and Special Boards), and exemplary performance processing. USAHRC will ensure compliance with Army Common Operating Environment standards through the Army Application Management Business Office (AAMBO). This program supports efforts to plan, design, develop, and test Information Technology (IT) solutions to fulfill the Army's Warfighter Support Mission, accommodate emerging Army requirements, and fulfill Future Army needs. Ongoing development efforts support Army Selection Board processing across functional areas and components. FY 2027 dollars in the amount of $0.949 million will be used to complete the ASBS-S Phase III / ASBS 2.0 development. This will involve integrating legacy applications that support selection board preparation, post-board analysis and reporting, special board execution (including GO, Promotion, and Special Boards), and exemplary performance processing. meets compliance with Army Common Operating Environment standards in accordance with Army Application Management Business Office (AAMBO). 2. Army Records Information Management System (ARIMS) is the Army's policy and enterprise system deployed to meet statutory (36 CFR) and regulatory (AR 25-1, AR 25-400-2, E.O. 13526) requirements to manage records that document the policies, decisions, and actions of the Army both as a military department and federal institution.
- Product Development
- Support
Information Technology for Criminal Investigations — one RDT&E project inside PE 0605013A. Congressional marks are recorded on the program element, not on a project.
Project FM9 — Information Technology for Criminal Investigations — requests $3.2M in FY2027, 2.6% of the $121.5M requested for program element 0605013A. Year over year it grows 2.8% against FY2026.
Project FM9 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 3.0 |
| FY2026 | Enacted | 3.1 |
| FY2027 | Request | 3.2 |
| FY2028 | Outyear | 3.2 |
| FY2029 | Outyear | 3.3 |
| FY2030 | Outyear | 3.3 |
| FY2031 | Outyear | 3.4 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2027 planned work The FY 2027 funding is required to continue the development of the new Case Management System (CMS). Development will build upon the FY2026 work to incorporate mandatory external sharing DoW law enforcement initiatives, new stakeholder requirements, enhanced interagency data feeds and increase the user experience by decreasing labor-intensive user interaction through machine learning.
FY2026 to FY2027 change The FY 2027 funding increase from FY 2026 to FY 2027 is due to economic adjustments. The funding allocates more dollars for increased labor costs. It enables the contract to employ highly qualified and certified technical personnel needed to develop the new modern case using advanced technology.
FY2026 plans — current year FY 2026 funding required to continue the code upgrade, continuous development of backlog items, and modernization of new case management system (CMS). Will continue the development cycle of the over 100 development items, new requirements and enhance functionality and user-friendliness by reducing labor-intensive user interaction.
FY2025 accomplishments RDT&E dollars are required to continue the code upgrade, continuous development of backlog items, and modernization of ALERTS. The CIMS contract was awarded 12 May 2023 for a 4-year period. With the end of the previous CIMS contract over 100 development items, new or in development stage, remains for development. ALERTS application code is over 10 years old and requires a complete code upgrade. Code modernization is required to meet mandatory DoD and Army infrastructure and security requirements.
What project FM9 buys
The project Criminal Investigation Management System (CIMS) is to develop, maintain, and operate a secure, unified comprehensive system of applications to support the Army's law enforcement (LE) mission and to transform the Department of the Army Criminal Investigation Division (DACID) LE applications through continuous innovation and modernization to improve operational methodologies consistent with current LE community practices. The funding will enable the continuous effort to innovate and modernize the Criminal Investigation Management System (CIMS). Funds will allow the development and support of law enforcement data sharing in the Army Law Enforcement Community of Interest, as well as complying with mandated external sharing initiatives with DoW law enforcement agencies, select Army systems data sources which will be integrated into a single net-centric portal structure. The new CMS will be hosted in the cloud, and DACID has entered a partnership with Army G2-CI to share code, and base system in order to gain efficiencies.
- Product Development
Army Accessioning IT Development — one RDT&E project inside PE 0605013A. Congressional marks are recorded on the program element, not on a project.
Project FL9 — Army Accessioning IT Development — requests $2.2M in FY2027, 1.8% of the $121.5M requested for program element 0605013A. Year over year it grows 0.7% against FY2026.
Project FL9 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 2.1 |
| FY2026 | Enacted | 2.1 |
| FY2027 | Request | 2.2 |
| FY2028 | Outyear | 2.2 |
| FY2029 | Outyear | 2.2 |
| FY2030 | Outyear | 2.2 |
| FY2031 | Outyear | 2.2 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2027 planned work FY 2027 research will continue to build on previous efforts to identify and address (through assessment and intervention) individual and organizational risk and protective factors associated with risk of suicide and will explore unique factors associated with high-risk formations (e.g., combat formations). This body of work will examine relationships between related harmful behaviors and will identify methods to enhance Army leaders' abilities to build protective environments and facilitate access to services. FY 2027 funding will support the development and validation of tools, training, and organizational structures that contribute to reductions in harmful behaviors and enhance positive…
FY2026 to FY2027 change Increase is due to revised economic assumptions.
FY2026 plans — current year FY 2026 research will build on previous efforts to identify and address (through assessment and intervention) individual and organizational risk and protective factors associated with risk of suicide and will explore unique factors associated with high-risk formations (e.g., combat formations). This body of work will examine relationships between related harmful behaviors and will identify methods to enhance Army leaders' abilities to build protective environments and facilitate access to services. FY 2026 funding will support the development and validation of tools, training, and organizational structures that contribute to reductions in harmful behaviors and enhance positive outcomes…
FY2025 accomplishments FY 2025 funds will support the continued assessment of sub-clinical behavioral issues and the identification of cross-cutting risk and protective factors and preventive approaches for harmful behaviors. Updating modernization of data and analytical tools to support data assessments aligning to the OSD Suicide Prevention Response Independent Review Commission recommendations.
Named performers on project FL9
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project FL9 buys
Research related to the Army Suicide Prevention Program enhances the Army's ability to prevent suicidal behaviors by increasing understanding of risk and protective factors and by developing and testing interventions. Research in this area supports development and modification of policies, programs, and practices that address suicide prevention and related harmful behaviors that are devastating to the Total Army and its mission. This program also helps DoW ensure Service members start their military career with the skills and knowledge needed to be successful and to confront, overcome, and/or grow from challenges faced both in their military career and personal life. Research in this program will result in more precise determinations of potential for future successful service, and more targeted identification of individual or unit-level needs (e.g., requirements for intervention, training, and/or behavioral health services). Continued funding supports a comprehensive approach to the prevention of harmful outcomes for Soldier and ensures the Army's ability to meet mission requirements in the current and future operating environments. FY 2027 funding in the amount of $2.160 million will expand efforts to assess and address risk and protective factors related to suicide, particularly in high-risk formations like combat units. The study will examine links between harmful behaviors and identify ways to strengthen Army leaders' ability to foster protective environments and improve access to services. Funding will also support the development and validation of tools, training, and organizational frameworks aimed at reducing harmful behaviors and improving outcomes throughout the Soldier Lifecycle, from selection and training to leadership development.
- Product Development
Army Human Resource System — one RDT&E project inside PE 0605013A. Congressional marks are recorded on the program element, not on a project.
Project 099 — Army Human Resource System — requests $1.6M in FY2027, 1.3% of the $121.5M requested for program element 0605013A. Year over year it grows 14% against FY2026.
Project 099 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 3.1 |
| FY2026 | Enacted | 1.4 |
| FY2027 | Request | 1.6 |
| FY2028 | Outyear | 1.3 |
| FY2029 | Outyear | 1.1 |
| FY2030 | Outyear | 1.1 |
| FY2031 | Outyear | 1.1 |
2 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2027 planned work FY 2027 dollars in the amount of $1.566 million will continue to support enhancements during the CI/CD phase. Planned capabilities include interface development as mandated by Army Vantage, deliver the Civilian Training Opportunity (CTO), and support for Institutional Delivered Credential (IDC) tracking and processing.
FY2026 to FY2027 change ArmyIgnitED is currently in the CI/CD phase. The increase from FY 2026 to FY 2027 reflects the cost of required enhancements and ongoing development efforts.
FY2026 plans — current year FY 2026 will continue to support the CI/CD phase. Planned capability enhancements include: Significant updates to coincide with Voluntary Education program policy changes, establish an interface with Army Vantage, make updates to software to stay in compliance with security requirements, and the maintenance of interfaces to meet updated data requirements.
FY2025 accomplishments Title: ArmyIgnitED Description: ArmyIgnitED is an IT financial management portal and decision support tool for Soldiers, Cadets, and civilians to request Tuition Assistance (TA) and Credentialing Assistance (CA), Cadets to request scholarship payments, and Army civilians to request training funds online, anytime, for classroom, distance learning, and college courses. When fully deployed, ArmyIgnitED will be used by approximately 1.4 million end users at both Continental United States (CONUS) and Outside the CONUS (OCONUS) locations. It will be the Army's single, next-generation, enterprise-wide TA, CA, and reimbursement management software system. ArmyIgnitED develops a more educated…
FY2025 accomplishments Integrated Personnel Pay System - Army (IPPS-A) release for Personnel did not fully subsume Legacy RLAS for Personnel requirements. Legacy RLAS will maintain these personnel components within the Personnel Module of RLAS to support until such time it is subsumed by IPPS-A. RLAS still maintains Resource Management modules and Training Module in support of RLAS Order Writer processing Annual Training (AT), School, and Active Duty Operational Support - Reserve Component (ADOS-RC) for Active Duty Orders; and Inactive Duty Training (Battle Assembly and Additional Drill Assembly types) for Army Reserve Soldiers. RLAS also provides support to USARC G8 Pay Management Division (PMD) to support…
Named performers on project 099
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 099 buys
The Army Human Resource System Project (099) contains the following programs: ArmyIgnitED Modernization managed by the Capability Program Executive - Enterprise Software and Services (CPE ES2) and Regional Level Applications Software (RLAS) managed by United States Army Reserves (USAR). 1. ArmyIgnitED: In support of recruiting and retention for a more educated workforce, ArmyIgnitED supports the Army Credentialing and Education Division (ACED) 24/7 virtual financial management portal, and decision-support tool for 1) Active Duty, US Army Reserves and Army National Guard Soldiers to request Tuition Assistance (TA); 2) Cadets to request scholarship payments and 3) Department of the Army (DA) Civilians and Apprentices to request professional development funds. As an enterprise system, ArmyIgnitED streamlines eligibility verification for higher education funds and increases efficiencies through automated processes. The system supports Soldiers, Scholarship Cadets, DA civilians and apprentices pursuing post-secondary educational goals and professional development objectives. Army education counselors use it to provide educational guidance; Career Program Managers and Training Managers use it to manage civilian training; and Academic Institutions use it to deliver degree and course offerings and to report user progress and degree completions for approximately 1.4 million Soldiers, Cadets and civilians. ArmyIgnitED includes an automated registration tool that enforces policies and procedures, serves as a financial feeder for automated financial transactions, tracks academic / training progress within the system, and provides visibility of financial management and regulatory compliance of enrollment processes. ArmyIgnitED is hosted in the Air Force's Amazon Web Services (AWS) GovCloud (Cloud One) environment. FY 2027 dollars in the amount of $1.566 million will continue to support enhancements during the CI/CD phase. Planned capabilities include interface development as mandated by Army Vantage, deliver the Civilian Training Opportunity (CTO) capability, and support for Institutional Delivered Credential (IDC) tracking and processing. 2.
- Product Development
Information Systems for Installations — one RDT&E project inside PE 0605013A. Congressional marks are recorded on the program element, not on a project.
Project BY3 — Information Systems for Installations — requests $1.5M in FY2027, 1.3% of the $121.5M requested for program element 0605013A. Year over year it falls 6.2% against FY2026.
Project BY3 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 2.4 |
| FY2026 | Enacted | 1.6 |
| FY2027 | Request | 1.5 |
| FY2028 | Outyear | 2.0 |
| FY2029 | Outyear | 1.9 |
| FY2030 | Outyear | 1.4 |
| FY2031 | Outyear | 1.4 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2027 planned work FY 2027 dollars in the amount of $1.525 million will fund scaling the VTIME Integrated Installation Planning (VIIP) installation master planning solution to onboard additional Active Army installations, and provide enhancements prioritized by the product and user engagement team. Funds will also complete the Fort Benning initial operating capability of the Smart Installation Virtual Operations Center (SIVOC), reaching authorization to operate and supporting at least ten installation management use-cases. Funds will continue to support acquisition planning activities and procure and deploy the enduring VTIME solution.
FY2026 to FY2027 change FY 2027 decrease is due to economic adjustments.
FY2026 plans — current year FY 2026 dollars in the amount of $1.625 million will fund the migration of the cloud Virtual Toolbox for Installation for Mission Effectiveness (VTIME) components to cArmy, hardening and authorization of the Integrated Installation Planning (VIIP) pilot operating capability and data interface agreements. Funds will complete design and partial integration of VTIME real-time decision-support solutions with production systems at Fort Benning. Funds will continue to support acquisition planning activities for VTIME scaling to Army wide implementation.
FY2025 accomplishments FY 2025 Base dollars in the amount of $2.385 million will begin preparations for transition to a production cloud environment and information exchange agreements; completing hardening and risk management framework processes on the RDE network. The emerging aligned and transformed datasets were made available to installation planning software and real-time decision-support and installation common operating picture (COP) tools; user registration and role management was implemented and standardized across applications. Planning software is being live-piloted with 12-installations and expected to improve the process and result in significant real cost savings to the Army. Real-time integration…
Named performers on project BY3
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project BY3 buys
The Virtual Toolbox for Installation Mission Effectiveness (VTIME) is the Army's real-time planned installation common operating picture, analysis, visualization and planning tool. It serves as an integrating and processing hub for numerous Army Installation Modernization technologies supporting users across echelons. VTIME will support the Army installation enterprise with a near real-time common operating picture of data spanning functional areas and offer a modern analytic platform to support Army mitigation of Army Installations gaps in the Installations Capabilities Based Assessment, the Army Data Strategy, and Army Business Management Plan. VTIME has been prototyped as a hybrid cloud solution, to implement commercially available technologies and understand diverse installation data sources and improve installation planning and operations. VTIME will apply artificial intelligence and machine learning to improve strategic, operational, and tactical installation decision-making, spanning functions such as facility investment planning, space and land assignment, master planning, and Garrison operations. VTIME is designed for hybrid-cloud implementations, to offer installations the ability to support operations under network-contested conditions. This integrated and comprehensive prototype can allow the senior commander to both maneuver in a complex battlespace by providing the ability to prevent, protect and recover from hazards and enable cost saving through improved decision-making and operational efficiencies, supporting future integrations of emerging installation operations modernizing technologies. Work is performed by the United States Army Engineer Research and Development Center (ERDC) and Capability Program Executive Enterprise Software & Services (CPE ES2). Work in this Project is related to, and fully coordinated with, PE 0605013A (Information Technology Development) and Project T05 (Army Business System Modernization Initiatives), and PE 0603119A (Ground Advanced Technology for $2.5 million for 'Smart and Resilient Installations'). Work in this Project supports the Army Installations Strategy as a critical enabler (data analytics) for modernization. Work in this Project complements the Office of the Assistant Secretary of the Army (Installations, Energy & Environment)'s Installation Modernization Pilot Program (AIMP2).
- Management Services
- Product Development