Roll-up of 5 projects. Projects are the summable leaves — the PE total is their sum, never added to it.
For fiscal year 2027, Defense-Wide agencies are requesting $927.9M for AEGIS BMD under RDT&E program element 0603892C, up 68% over FY2026. In the FY2027 defense authorization, House approps moved to cut it to $917.4M.
Funding profile, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 653.6 |
| FY2026 | Enacted | 551.0 |
| FY2027 | Request | 927.9 |
| FY2028 | Outyear | 958.0 |
| FY2029 | Outyear | 883.4 |
| FY2030 | Outyear | 889.7 |
| FY2031 | Outyear | 781.8 |
Acquisition lifecycle
This program is funded in RDT&E Budget Activity 4 — Advanced Component Development & Prototypes.
5 projects roll up into PE 0603892C
Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 68% overall, which can hide much larger swings below.
Aegis BMD Development Support
Aegis BMD SM-3 Development
Program-Wide Support
Cyber Operations
The request is contested
Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.
Where the FY2027 request goes
Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.
| Where FY2027 funding flows | Share | $M |
|---|---|---|
| Industry primes | 63% | 585.1 |
| Government labs & warfare centers | 26% | 241.9 |
| Other / unspecified | 11% | 100.9 |
| FY2027 request | 100% | 927.9 |
Mission & acquisition strategy
Aegis Based Defense continues the development of a Sea-Based BMD capability in support of the Missile Defense Agency (MDA) mission to protect the homeland, deployed forces, friends and allies from ballistic missile threats of all ranges and in all stages of flight. - Aegis BMD Technology Design and Insertion: Aegis BMD Technology Design and Insertion enable cross-baseline specification management and capability assessments to ensure consistent application of technical standards, processes, and procedures across the Aegis BMD program.
The Sea-Based Weapon Systems element acquisition approach supports evolutionary development, continuously building upon demonstrated capabilities to advance overall missile defense capability. After considering all the technical and management aspects of the program and to meet the requirements presented by an evolving ballistic missile threat, the Sea-Based Weapon Systems program awarded sole source contracts to Raytheon and Lockheed Martin to continue development of the SM-3 and the Aegis BMD Weapon System, respectively. The M&S acquisition strategy utilizes full and open competition to develop, acquire and deliver the integrated architectures/frameworks, as well as develop and deliver models of Aegis systems.
- Product Development
- Support
Ask this program element
Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.
This page carries the budget justification and the NDAA marks — nothing else. For what Lockheed Martin has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.
Cite this page
/programs/0603892C.md · MCP mcp.hitchintel.com → budget_get_program_element, budget_get_cong_marksAegis BMD — one RDT&E project inside PE 0603892C. Congressional marks are recorded on the program element, not on a project.
Project MD09 — Aegis BMD — requests $584.5M in FY2027, 63% of the $927.9M requested for program element 0603892C. Year over year it grows 62% against FY2026.
Project MD09 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 385.9 |
| FY2026 | Enacted | 360.1 |
| FY2027 | Request | 584.5 |
| FY2028 | Outyear | 512.0 |
| FY2029 | Outyear | 430.8 |
| FY2030 | Outyear | 407.8 |
| FY2031 | Outyear | 340.6 |
9 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
The exhibit describes this work once, for project MD09 as a whole, rather than per activity. Read the project justification →
- Conduct future concept feasibility analysis aligned to real world event (RWE) observations to increase alignment and delivery of capability addressing warfighter needs in support of all planned defense missions and improve process for Service (e.g. U.S. Navy) collaboration. - Develop a capability using artificial intelligence…
Read the FY2027 plan →- No funding is requested in FY 2027.
- Deliver BMD 5.2.2 (Aegis BL 9.C3.2). - Commence 5.2.3 (Aegis BL BL9.C3.3), which includes close-range ballistic missile defense improvements to include updates to the Mission Planner. - Commence PAC-3 integration with BMD 5.2.4 (Aegis BL 9.C3.4), which includes system performance enhancements with close-range ballistic missiles…
Read the FY2027 plan →Deliver BL 10.0.1 (BMD 6.0.1): - Finalize development and conduct Navy Combat System Certification Panel for Aegis BL 10.0.1 (BMD 6.0.1). - Support FTM-42 and operational test for Initial Operational Capability (IOC) and Operational Capacity List (OCL) determination. Continue Aegis BL 10.1 (BMD 6.1) software development incorporating SBT…
Read the FY2027 plan →The exhibit describes this work once, for project MD09 as a whole, rather than per activity. Read the project justification →
The exhibit describes this work once, for project MD09 as a whole, rather than per activity. Read the project justification →
- Commence RF Link Security Improvements between Aegis BL10 (BMD 6.1) Weapon System and SM-3 Block IIA to enhance missile-to-ship communications.
- Complete integration of Cooperative Engagement Capability into AGS BL to support Joint Integrated Fires Control architecture. - Complete AGS EOC BL Development to enable Combat System Certification in support of the Department's PDI investments in the Indo-Pacific region and the Guam Defense System Joint Program Office Increment 1…
Read the FY2027 plan →Named performers on project MD09
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project MD09 buys
Aegis Based Defense continues the development of a Sea-Based BMD capability in support of the Missile Defense Agency (MDA) mission to protect the homeland, deployed forces, friends and allies from ballistic missile threats of all ranges and in all stages of flight. - Aegis BMD Technology Design and Insertion: Aegis BMD Technology Design and Insertion enable cross-baseline specification management and capability assessments to ensure consistent application of technical standards, processes, and procedures across the Aegis BMD program. Aegis BMD specific efforts include systems engineering and architecture (process and execution); Modeling and Simulation (M&S); Ship integration; and Quality, safety, and mission assurance. - Aegis BL (BMD) Development Efforts: (1) Aegis BMD 4.X Development: Aegis BL 5.4.1 (BMD 4.2) is a joint effort with the U.S. Navy that refurbishes existing ship Army Navy/Transportable Radar Surveillance and Control-1 (AN/SPY-1) radar arrays with the installation of antenna Low Noise Amplifiers (LNAs). As a result of cost growth and schedule delay, MDA and Navy jointly realigned the LNA program to include hardware and software upgrades with no LNA hardware procurements. The restructured program referred to as BMD 4.1.3, spiral capability for the non-LNA upgrades that began in FY 2024 to include Sea Based Terminal Increment (SBT) 2 Capability Upgrade, Hypersonic Tracking and Reporting, Mission Planner Console update, and Threat Database re-architecture. This capability began delivering to 21 Flight I/II Guided Missile Destroyer (DDG) ships in FY 2025. (2) Aegis BMD 5.X Development: Aegis BL 9 (BMD 5.1.5 and 5.2 (previously BMD 5.1.6)) software spiral aligns with U.S. Navy Aegis BL 9 Capability Package (CP) 2024 and Aegis BL 9.C3. The software spiral provides enhanced detection, track, report, and defeat capabilities of additional medium, intermediate, and long-range threats with increasingly complex engagement scenes and increased raid sizes. Through a series of unique Capability Insertion Packages, BMD 5.X capability spirals provide continuous software updates to the original BMD 5.1.0 5 architecture to incorporate emerging Missile Defense System capabilities, Warfighter improvements, SM-3 software updates, PAC-3 missile integration with system performance enhancements and improved Weapon System performance necessary to pace the threat.
- Product Development
- Support
Aegis BMD Development Support — one RDT&E project inside PE 0603892C. Congressional marks are recorded on the program element, not on a project.
Project MX09 — Aegis BMD Development Support — requests $175.3M in FY2027, 19% of the $927.9M requested for program element 0603892C. Year over year it grows 39% against FY2026.
Project MX09 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 194.0 |
| FY2026 | Enacted | 125.8 |
| FY2027 | Request | 175.3 |
| FY2028 | Outyear | 213.6 |
| FY2029 | Outyear | 225.0 |
| FY2030 | Outyear | 241.6 |
| FY2031 | Outyear | 242.5 |
4 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
The exhibit describes this work once, for project MX09 as a whole, rather than per activity. Read the project justification →
- Develop and deliver updated threat models in support of the threat adaptation integration with in-service baselines. - Conduct studies and concepts supporting development based on real-world lessons learned. - Execute backfit capability deliveries to in-service Aegis baselines to enhance operational performance and extend system…
Read the FY2027 plan →Increase from FY 2026 to FY 2027 provides additional Cerberus IAMD Planner updates.
- Update Ballistic Missile Defense Test Bed San Diego (BTS) with Mod 0 and Mod X hardware to align with Baseline 10 hardware configuration to support development testing and Ground/Flight Test requirements.
Named performers on project MX09
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project MX09 buys
Provides Government, contractor, and Federally Funded Research and Development Center (FFRDC) workforce that manage the overall Aegis Based Defense program and enables the program to develop, build, and test standard missiles and associated Aegis Weapons Systems. Aegis Based Defense, in accordance with negotiated agreements between the United States (U.S.) Navy and the Missile Defense Agency (MDA) has identified and segregated funding for Developmental Support of Aegis Based Defense specific elements resident aboard Aegis capable U.S. Navy ships. Computer Program Support consists of, but is not limited to, reviews of Technical Observation Reports (TORs) that are generated by ship crews during exercises or deployments, determination of root causes and preparation of Computer Program Change Request (CPCR) to correct TORs, updates to the in-service computer program to apply, test and certify multiple CPCRs, and tests installation of Aegis Weapon System (Army/Navy Surface Radar Surveillance and Control Radar/Fire Control System) alignment updates as required. Aegis Based Defense provides support to Annual Integration Events to ensure any updated Aegis Combat System computer programs do not degrade Ballistic Missile Defense (BMD) equipped ships and provides distance and technical support for BMD equipped ships. Provides Fleet operations and mission support to enable the conduct of sustained BMD operation.
- Support
Aegis BMD SM-3 Development — one RDT&E project inside PE 0603892C. Congressional marks are recorded on the program element, not on a project.
Project MM09 — Aegis BMD SM-3 Development — requests $126.1M in FY2027, 14% of the $927.9M requested for program element 0603892C. Year over year it grows 366% against FY2026.
Project MM09 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 22.3 |
| FY2026 | Enacted | 27.1 |
| FY2027 | Request | 126.1 |
| FY2028 | Outyear | 195.8 |
| FY2029 | Outyear | 188.9 |
| FY2030 | Outyear | 197.5 |
| FY2031 | Outyear | 158.6 |
2 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
- Commence SM-3 Block IB missile with the integration of a new DROIC into the seeker's Integrated Dewar Assembly (IDA) that increases performance, increases acquisition range, speeds discrimination, and allows for adding new threats with complex countermeasures in the defense of the homeland and increased capability against existing…
Read the FY2027 plan →Decrease from FY 2026 to FY 2027 reflects completion of GEU-ECP.
Named performers on project MM09
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project MM09 buys
Provides development of SM-3 Missiles, Upgrade Modifications, and Integration into the Aegis Weapon System. The SM-3 Block IB improves Aegis Based Defense ability to expand the BMD battlespace, engage longer range, more sophisticated ballistic missiles that may deploy countermeasures and launch in larger raid sizes. The SM-3 Block IB Kinetic Warhead's two color infrared seeker and advanced signal processor provides a real-time discrimination and characterization capability while improving sensitivity for longer range targets. SM-3 Block IB provides capability in the exo-atmospheric region at a reduced cost, allowing SM-3 Block IIA All-Up Rounds to attack the more complex missile threats. The SM-3 Block IB missile is a vital piece of the layered Missile defense that Aegis Based Defense provides our nation. The SM-3 Block IIA consists of an upgrade to a 21-inch diameter SM-3 missile and expands beyond the SM-3 Block IB battlespace to counter Intermediate Range Ballistic Missile. SM-3 Block IIA provides an increased kinematic envelope through improved infrared discrimination and divert capability that provide performance against the European Phased Approach phase III expanded threat set. When combined with Aegis BMD 5.1 weapon system modifications, the SM-3 Block IIA will provide Engage on Remote (EoR) capability, which allows the use of remote off board sensor information to launch and guide the SM-3 Block IIA to final intercept. Aegis BMD 5.1 EoR capability with SM-3 Block IIA also frees up radar resources and increases the number and type of threats to be engaged simultaneously over previous baselines.
- Product Development
Program-Wide Support — one RDT&E project inside PE 0603892C. Congressional marks are recorded on the program element, not on a project.
Project MD40 — Program-Wide Support — requests $35.1M in FY2027, 3.8% of the $927.9M requested for program element 0603892C. Year over year it grows 11% against FY2026.
Project MD40 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 45.4 |
| FY2026 | Enacted | 31.5 |
| FY2027 | Request | 35.1 |
| FY2028 | Outyear | 29.5 |
| FY2029 | Outyear | 31.4 |
| FY2030 | Outyear | 35.1 |
| FY2031 | Outyear | 32.3 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
- Increase from FY 2026 to FY 2027 reflects the PWS allocation on a pro-rata basis across multiple Agency PE's each FY based on the total Agency budget and, therefore, fluctuates per PE by FY.
Named performers on project MD40
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project MD40 buys
PWS contains non-headquarters management costs in support of Missile Defense Agency (MDA) functions and activities across the entire Missile Defense System. These functions include Government Civilians and Contract Support Services. This effort provides integrity and oversight of the Missile Defense System as well as supports MDA in the development and evaluation of technologies that will respond to the changing threat. Additionally, PWS includes personnel to support global deployments performing deployment site preparation, activation, and provides facility capabilities for MDA Executing Agent locations worldwide. Other MDA wide costs include: physical and technical security; civilian drug testing; audit readiness; the Science, Technology, Engineering, and Mathematics (STEM) program; legal services and settlements; travel and agency training; office, equipment, vehicle, and warehouse leases; utilities and base operations across multiple geographic locations; commercial and ancillary facility services; management of all facility aspects regardless of lifecycle stage; supplies and maintenance; compliance with statutory environmental requirements; data and unified communications support; materiel and readiness and central property management of equipment; Facilities Sustainment, Restoration and Modernization (FSRM) program (formerly Real Property Maintenance) to keep the Department's inventory of facilities in good working order; and similar operating expenses. PWS is allocated on a pro-rata basis across most Agency PEs and, therefore, fluctuates per PE by FY based on the total Agency budget in that FY.
- Support
Cyber Operations — one RDT&E project inside PE 0603892C. Congressional marks are recorded on the program element, not on a project.
Project MC09 — Cyber Operations — requests $7.0M in FY2027, 0.7% of the $927.9M requested for program element 0603892C. Year over year it grows 6.9% against FY2026.
Project MC09 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 6.1 |
| FY2026 | Enacted | 6.5 |
| FY2027 | Request | 7.0 |
| FY2028 | Outyear | 7.1 |
| FY2029 | Outyear | 7.3 |
| FY2030 | Outyear | 7.7 |
| FY2031 | Outyear | 7.8 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
The exhibit describes this work once, for project MC09 as a whole, rather than per activity. Read the project justification →
Named performers on project MC09
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project MC09 buys
Sustain the Department of War (DoW) Risk Management Framework (RMF) Certification and Accreditation (C&A) process and Controls Validation Testing (CVT) activities, analysis of validation results, risk assessments and reviews of proposed Program Manager/Information Systems Security Manager. This project supports the monitoring and tracking of Cybersecurity mitigation detailed in Information Technology Security Plan of Action and Milestones. Activities include preparation of Certification and Accreditation documentation and accreditation recommendations to the Missile Defense Agency Authorizing Official. Independent Verification and Validation team actions ensure the availability, integrity, authentication, confidentiality and non-repudiation of the Aegis mission and non-mission systems, which includes test and remote site administrative systems. Activities in the Project are necessary to comply with the Federal Information Security Management Act.
- Support